Similar Projects
Lake Station Crossroads Lift Station Replacement - Section 219
Design
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Gary Sanitary District 27th and Chase Pump Station Force Main Replacement - Section 219, Gary, Lake County, Indiana (USACE Acquisition)
Design
$1,000,000 to $5,000,000 est. value
Gary, IN

Commerce Drive Lift Station Replacement
New Construction
Bidding
Bristol, IN 46507

Water Utility Improvements, Division "C" - Phase 3
Post-Bid
Crown Point, IN 46307

Lake Station Crossroads Lift Station Replacement, Lake Station, Lake County, Indiana (Usace Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Hague Road and Allisonville Road Lift Stations Improvements
Results
$2,000,000 est. value
Fishers, IN 46038

ARV & Pump Station & Force Main Replacement
Results
Clarksville, IN 47129

Perry Crossing Lift Station Rehabilitation
Post-Bid
Sellersburg, IN

Daylight South Lift Station Rehab
Results
Evansville, IN 47708

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Cane Run Flood Control Pumping Station 5
Post-Bid
$5,000,000 to $6,000,000 est. value
Jeffersonville, IN

Perry Lakes Lift Station Improvements
Results
Fort Wayne, IN 46802

Schoolview Drive Lift Station Improvements
Post-Bid
Rochester, IN

Heaton Lake Lift Station Upgrades
Results
Goshen, IN 46526

Reported 05/08/2021 12:00 AM
Project Title

Deep Dewatering Pump Station

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN   (Allen County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under this Contract includes the construction of the 3RPORT Deep Dewatering Pump Station (DDPS), including outfitting and installing equipment within shafts excavated by others, above grade structures, gravity sewers, and appurtenances. The DDPS will utilize two vertical, below-grade shafts to serve as the Pump Station Shaft and Upflow Shaft. The initial excavation and concrete lining of these shafts and connecting tunnel will be performed by others outside this Contract as part of the 3RPORT Tunnel and Shafts Package. Descriptions and depictions of the shafts, tunnel, and conditions at the DDPS site within these Contract Documents are based on the anticipated status at turnover following the 3RPORT Tunnel and Shafts Package; actual conditions and arrangement of these aspects of the Work may vary depending on the final construction of the 3RPORT Tunnel and Shafts Package. The Contract consists of, but is not limited to, the following major components: 1. Installation and construction of the equipment, systems, and structure within and above the Pump Station Shaft, including the Deep Dewatering Pump Station Building located (Pre-engineered Metal Building) above the Pump Station Shaft. 2. Installation and construction of the equipment, systems, and structure within the Upflow Shaft (referred to as the Working Shaft in the 3RPORT Tunnel and Shafts Package), including the Screenings and Grit Handling Enclosure (Pre-engineered Metal Building) located above the Upflow Shaft. 3. Installation and construction of Siphon Conduits, Flap Gate Structure, Siphon Conduit Structure, and all appurtenances. 4. DDPS discharge piping.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents