Similar Projects
Relay Brick Walkway at Nesmith Library
Infrastructure
Bidding
Windham, NH 03087

Granite Curb Services
Term Contract
Bidding
Salem, NH

Driveway Sealing and Striping
Post-Bid
Madison, NH 03849

Acquisition and Development of Pearl Street Parking Lot
Infrastructure
Post-Bid
Manchester, NH 03104

Whittier Street Sidewalk Improvements
Results
Dover, NH

Cheshire Rail Trail III Loop Project
Results
Less than $306,636 est. value
Keene, NH

Keene Housing Site Improvements - Multiple Locations
Renovation
Construction
Keene, NH

Bituminous Concrete Sidewalk
Term Contract
Bidding
Salem, NH

Acquisition and Development of Hartnett Parking Lot
Infrastructure
Post-Bid
Manchester, NH

Wason Pond Community Center Ramp
Results
Chester, NH 03036

Sidewalk Curb Ramp Replacement
Infrastructure
Bidding
Nashua, NH

New Hampshire Farm Museum Parking Lot
Alteration
Post-Bid
Milton, NH 03851

Walkway Treatment
Results
Boscawen, NH

Road Rehabilitation Phase 2 and Sidewalk Replacement
Infrastructure
Bidding
Keene, NH

Police Station Parking Lot Expansion
Infrastructure
Post-Bid
Lebanon, NH 03766

Last Updated 04/06/2022 12:06 PM
Project Title

Sidewalk Projects

Physical Address View project details and contacts
City, State (County) Claremont, NH 03743   (Sullivan County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid 1 Hanover Street – from its intersection with North Street to Disnard School overlay sidewalk w/asphalt – 2,700 feet. Must mill 1” along curb’s edge and tack coat the entire surface. Required ADA compliance – metal truncated domes set in concrete preferred. Bid 2 South Street (north side) – from its intersection with Pleasant Street to Baker Street – remove old sidewalk and replace with new 4’ wide 2” thick 1/2” asphalt sidewalk - 1,325 feet. Requires ADA compliance – metal truncated domes set in concrete preferred. Must loam and seed. Bid 3 Added Alternate- South Street (south side)- from its intersection with Pheasant Lane to crosswalk by Henry Street- remove old sidewalk and replace with new 4’ wide 2” thick 1/2” asphalt sidewalk.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents