Similar Projects
Greendale Mall Redevelopment
Renovation, Demolition - 300,000 SF
Conception
Worcester, MA

Montachusett Veterans Outreach Center
Renovation
Conception
$21,500,000 est. value
Winchendon, MA

91 Lancaster Road Condominiums
New Construction
Design
Clinton, MA 01510

Fitchburg Arts Community
New Construction
Design
Fitchburg, MA 01420

Redevelopment of Former Grafton State Hospital
Post-Bid
Grafton, MA

Mixed-Use Development Project of Retail and Residential Units Within Four Parcel
Post-Bid
Upton, MA 01568

Interior Finish Renovations at Maher Court - General Bids
Renovation
Results
$311,100 est. value
Milford, MA 01757

Envelope Repairs Lincoln-Perkins Development - General Bids
Renovation
Results
Less than $570,880 est. value
Worcester, MA 01605

Southbridge-Wells Middle School Apartments
Renovation - 118,642 SF
Construction
$21,300,000 est. value
Southbridge, MA 01550

Northgate Meadows
New Construction - 69,000 SF
Construction
Leominster, MA 01564

Orient Street Development
New Construction
Pending Verification
Worcester, MA

Elwood Adams Building
Renovation - 18,345 SF
Pending Verification
Less than $1,200,000 est. value
Worcester, MA

Salisbury Pine Tree Estates
New Construction
Conception
Holden, MA 01520

Jefferson Lofts
Renovation
Design
Holden, MA 01522

Great Brook Valley Gardens Phase VI - Filed Sub-Bids
Renovation
Post-Bid
$1,294,724 est. value
Worcester, MA 01605

Last Updated 08/19/2021 12:33 PM
Project Title

Select Heating/DHW System Replacement and Heat Pump Pilot Study, Green Acres Village 200-1 - General Bids

Physical Address View project details and contacts
City, State (County) Fitchburg, MA 01420   (Worcester County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $263,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Replacement of the existing combination boiler/water heater units with new gas fired furnace with electric water heater in 8 units. Add Alternates to install New pilot heat pump replacement with electric water heaters in 2 units

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents