Similar Projects
Construction of the 1200 South Road Project
Post-Bid
Syracuse, UT

Asphalt Parking Lots
Post-Bid
Cedar City, UT 84721

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

Road Improvements Project
Results
Price, UT 84501

Otteson Subdivision Street Improvements
Alteration
Pending Verification
Salem, UT 84653

2021 Streets Project
Post-Bid
Brian Head, UT

2020 West Jordan Ada Pedestrian Ramp Project
Results
$259,428 est. value
West Jordan, UT

2021 Roadway Paving Project
Infrastructure
Post-Bid
Woodland Hills, UT

1200 South, 3600 E to 6400 E (Lake Creek Road) Non-Urban
Results
$1,308,996 est. value
Heber City, UT 84032

City-Wide Roadway Improvement Project
Infrastructure
Post-Bid
Cottonwood Heights, UT

Local Strees Reconstruction 2021 #1
Results
Less than $2,383,000 est. value
Salt Lake City, UT

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Moenave Trail Improvements
Results

2021 Draper Utah Asphalt Repair And Striping
Term Contract
Post-Bid
Draper, UT

Maybe Lane Improvements
Results
South Jordan, UT

Last Updated 06/16/2022 07:30 AM
Project Title

Asphalt Preservation and Re-striping and Seal Coat at Bryce Canyon National Park

Physical Address View project details and contacts
City, State (County) Bryce, UT   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide a pavement preservation product such as a seal coat, equivalent Onyx product. Must be applied through spray system. Provide the striping for the parking lot and bike path. Stripes will be 4 inches in width and white for parking stalls, yellow for centerline, white and blue for ADA, Paint will meet UDOT asphalt pavement specifications. For stencil work contractor will use Park stencils for future maintenance. Reflective beads will be applied on all painted areas The location is Bryce Canyon National Park Utah and consist of 2 parking lots and an asphalt bike path. The 3 set locations must be prepped and cleaned for product application. Traffic control will be on the contractor, must adhere tUDOT temporary traffic control standards, possible closure must be mitigated with park management team. Time frame for work is between June 15, 2022. - August 31, 2022. Parking lot #1: Visitor Center Parking 96,000 sq ft. Seal Coat 2700 linear ft of 4" white striping 4 ADA stalls, Blue/white 6 Directional arrows, will be white 1 Stop Bar will be white Parking lot #2: Overflow lot Parking 48,300 sq ft. Seal Coat 2400 linear ft of 4" white striping. 4 NO PARKING stencils will be white 1 Stop Bar will be white Asphalt Bike Path 10 feet in width and 26,752 ft in length of Seal Coat 25,470 linear ft of 4" solid yellow line applied down the center of path.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents