Similar Projects
PBSO, District 6 - Chiller Replacement
Bidding
Lake Worth, FL 33467

WUD, WTP 3 - Exhaust Fans Replacement
Term Contract
Bidding
Delray Beach, FL 33446

Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

2019 Commercial Pool Cooler
Results
North Palm Beach, FL 33408

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

Hagen Ranch Road Library - Chiller Replacement
Results
Delray Beach, FL 33446

Pahokee Housing Authority Padgett Island / Fremd Village HVAC Project
Post-Bid
Pahokee, FL 33476

GCC - Air Handler Unit #11 Replacement
Term Contract
Results
West Palm Beach, FL 33401

Building 12 Animal Lab Renovation
Post-Bid
Boca Raton, FL 33431

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

Commercial Pool Cooler System
Post-Bid
North Palm Beach, FL 33408

MCCH - HVAC Replacement AHU #28
Term Contract
Results
West Palm Beach, FL 33401

HVAC and Air Duct Replacement and Installation
Term Contract
Post-Bid
West Palm Beach, FL 33415

Last Updated 08/05/2020 08:08 AM
Project Title

NCGC - Chiller Replacement

Physical Address View project details and contacts
City, State (County) Palm Beach Gardens, FL 33410   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $285,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

a. Turnkey project to remove the existing Carrier water cooled chiller #1 unit,Model #23XL1111N020. Furnish and install a new, like for like direct replacement, Carrier water cooled chiller as shown on Exhibit “1” or PBC approved equal. b. Test, remove, reinstall and test the fire alarm devices, when applicable. c. Provide and install new disconnect4, connectors, sealtite conduit and wire from the disconnect to the unit. d. Provide Manufacturer start-up. Document system pressures and running load amps. e. System shall be started after installation is complete, and tested for proper operation with Capital Improvement Project Manager and the manufacturer’s representative present. f. Connect chiller controller to existing building management system; verify system operations and insure programing and communication are restored.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents