Similar Projects
Last Updated | 08/12/2020 12:18 AM |
Project Title | Micro-Surfacing Road Treatment |
Physical Address | View project details and contacts |
City, State (County) | Sanford, MI 48657 (Midland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $25,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0.42 miles of Micro-Surfacing Treatment on 3rd Street from the South Coleman City Limits to Railway Street in the City of Coleman, Midland County. The area to be treated has been micro-milled to a depth of 3/8”. The work shall be performed according to the 2012 MDOT Standard Specifications Section 504 and any other applicable sections. The lump sum bid includes the cost of mobilization, traffic control, preparing the surface, placing temporary pavement markings, and placing the micro-surfacing single course for full width coverage. 1.Existing surface has been Micro-Milled to a depth of 3/8” 2.Micro-surface, Single Cse = 7727 SY Estimated Area 3.Surface Preparation = 1 EA 4.Mobilization = 1 EA 5.Traffic Control = 1 EA 6.Temp Pavement Markings, Yellow = 90 FT |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |