Similar Projects
2019-2020 Highway Department Items - Catch Basin Cleaning
Term Contract
Results
Pelham, NH

South River Road Corridor and Utility Improvement
Results
Bedford, NH

Cast Iron Manhole Frames and Covers Hinged Ball and Socket System
Results
Merrimack, NH

Highway Department Items - Catch Basin Cleaning
Term Contract
Results
Pelham, NH

2021 CIPP Lining Program
Results
Nashua, NH

Frames and Grates
Term Contract
Results
Manchester, NH

Cohas Brook Sewer Project - Contract 4
Term Contract
Results
Manchester, NH

2020 Sewer Replacement Project
Results
Nashua, NH

Catch Basin Cleaning 2020
Results
Hollis, NH

Concrete Sewer and Drainage Structures
Term Contract
Results
Manchester, NH

Lining Services for Sewer Siphon
Bidding
Less than $175,000 est. value
Hudson, NH

2019 Sewer Replacement
Results
Goffstown, NH

Frames and Grates
Results
Manchester, NH

Catch Basin / Drain Pipe Cleaning and Inspection Program
Results
Manchester, NH

CMOM Program - Phase III Sewer Rehabilitation and Repair Project - Contract 4
Results
Less than $5,100,000 est. value
Manchester, NH

Last Updated 11/25/2020 10:09 AM
Project Title

Christian Brook Sewer Separation Project - Contract 1

Physical Address View project details and contacts
City, State (County) Manchester, NH   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Christian Brook Sewer Separation Project, Contract 1 includes construction of approximately one mile of reinforced concrete storm drain, including approximately 1,100 feet of 60-inch storm drain, 500 feet of 48-inch storm drain, 3,000 feet of 42-inch storm drain, and 200 feet of 24-inch storm drain at depths in the range of 12 to 22 feet. The project also includes installation of 24, 5-foot to 8-foot diameter precast manholes, reconfiguration of two existing CSO regulators and installation of new catch basins with four-foot sumps along the project corridor. Pavement restoration will consist of full depth roadway reconstruction. The project is expected to involve ledge removal and groundwater dewatering. Construction duration is approximately two years for final completion.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents