Similar Projects
Roof Replacement CVM Building, John Burns Park
Renovation
Sub-Bidding
$200,000 CJ est. value
Massapequa Park, NY 11762

Roof Replacement
Alteration
Post-Bid
$400,000 est. value
Roosevelt, NY 11575

Roof Replacement at Shore Road Yard
Renovation, Alteration - 5,600 SF
Post-Bid
Manhasset, NY 11030

East Games Kiosk Copper Roof
Alteration
Results
$80,345 to $103,975 est. value
Wantagh, NY 11793

2021-2022 Capital Improvement Program - Contract #1 -Roof Replacement
Demolition, Alteration - 1,600 SF
Results
Manhasset, NY 11030

Roof Repair Service Contract for Various Town of Oyster Bay
Alteration
Post-Bid
Oyster Bay, NY 11771

Roof Repairs
Alteration
Results
$60,000 est. value
Garden City, NY 11530

Firemen's Headquarters Roof Improvements
Alteration
Post-Bid
$900,000 est. value
Rockville Centre, NY 11570

Partial Roofing Replacement at Syosset High School
Alteration
Results
Syosset, NY 11791

Building Roof Replacements at Seven (7) LNA Service Stations Located in NJ, NY & PA
Alteration
Post-Bid

Hempstead Town Office Roof Replacement
Alteration
Results
Hempstead, NY 11550

Silicone Roofing Coating
Renovation
Post-Bid
Elmont, NY 11003

Job Order Contracting - Area 1 and 2
Alteration
Results
$2,000,000 to $3,000,000 est. value

Roofing Renovation at Rushmore Avenue School
Renovation
Post-Bid
$500,000 CJ est. value
Carle Place, NY 11514

Partial Roofing Replacement at South Woods Middle School
Alteration
Results
Syosset, NY 11791

Last Updated 04/11/2023 05:27 PM
Project Title

Jones Beach Concession Building Roof Replacement - Jones Beach State Park

Physical Address View project details and contacts
City, State (County) Hempstead, NY 11793   (Nassau County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,840,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work consist of Remove existing roof membrane and replace with new tapered insulation and epdm roof membrane. Contract term: 180 days All Request For Information (RFIs) are due by: 10:00AM on Thursday, April 6, 2023. RFIs received after this due date and time will not be processed. Pursuant to Public Building Law 8(6), any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,491,110 or less (maximum amount has been adjusted for inflation effective January 1, 2023). If more than one responsible and reliable MWBE firm meets the requirements, the MWBE firm with lowest bid will be deemed the apparent low bidder. In accordance with State Finance Law, Section 139-j, the following agency staff have been designated as contacts for this contract: For all technical questions - Utilize the contacts noted below: (Please email everyone) Mr. Keith Prosek 631-321-3590 Keith.Prosek@parks.ny.gov Mr. Scott Sepela 6321-321-3536 Scott.Sepela@parks.ny.gov LIEngineeringContracts 631-321-3544 LIEngineeringContracts@parks.ny.gov For administrative related questions - Utilize the contact noted below: Ms. Margaret Ziminski/ Ms. Tiffany Willms 631-321-3544 LIEngineeringContracts@parks.ny.gov Please note that contacting any other agency staff regarding this contract may be a violation of State Finance Law, Section 139-j, resulting in a determination of contractor non-responsibility. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 17% Women Owned Sub-Contracting Goal: 1% Service-Disabled Veteran-Owned Business Contracting Goal: 4% Estimated Range: $1,360,000.00 - $1,840,000.00 For administrative related questions - Utilize the contact noted below: Ms. Margaret Ziminski/ Ms. Tiffany Willms 631-321-3544 LIEngineeringContracts@parks.ny.gov Work of the Project is defined by the Contract Documents and a general description of the primary work elements is listed below for reference. Contractor is responsible for reviewing all the drawings and specifications to obtain a complete understanding of the entire work scope. The work includes all work indicated on the project documents, including but not limited to: 1. Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the work as required by the contract documents for this construction contract. 2. Remove the existing roof membrane, insulation, and cover boards down to the existing wood deck. 3. Remove existing skylights, mechanical units, gutters, and other roof mounted appurtenances where required. 4. Remove the entire roof and structure of the tower high roof. 5. New TPO roofing, insulation, and cover board. 6. New plywood decking where existing is in unacceptable condition. New fasteners of decking to wood roof joists. Possible replacement of wood roof joists, dependent on revealed conditions. 7. New tower high roof structure. 8. New skylights. New roof hatch. 9. Infill select roof openings. 10. Extension of roof curbs where required. 11. New gutters and connection to existing downspouts. 12. Cleaning of existing roof drainage and piping. 13. Masonry repairs, including: repointing, cleaning, brick replacement, facade reinforcement, and stone resetting. 14. Construction fencing and other security measures. 15. Temporary facilities and controls. 16. Project closeout submittals. 17. All other requirements shown on the plans or included in the specifications.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents