Similar Projects
Inclusive Playground Common Earthwork McKee Farms Park
New Construction
Bidding
Fitchburg, WI 53711

Rotary Park Improvements
Post-Bid
Stoughton, WI

Orfan Park Tennis Court and Basketball Court Resurfacing Project
Post-Bid
Less than $50,000 est. value
Sun Prairie, WI 53590

Playground Replacements at Sunny Valley and Hunter's Ridge Parks
Results
Less than $90,000 est. value
Sun Prairie, WI 53590

Liberty Park Shelter and Bathroom
Results
Less than $315,000 est. value
Sun Prairie, WI 53590

The Boneyard
New Construction - 2,400 SF
Construction
$500,000 to $1,000,000 CJ est. value
Madison, WI

Limestone Ridge Outdoor Pool
New Construction - 4,384 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fitchburg, WI 53719

Birkinbine, Grandview, Reserve and West Prairie Village Parks Playground Project
Post-Bid
$280,000 est. value
Sun Prairie, WI 53590

Fireman's Park Splashpad
Results
De Forest, WI

PlayGround Components
Post-Bid
Cottage Grove, WI 53527

Sheehan Park Concrete Skate Park Addition
Addition - 4,600 SF
Results
Less than $275,000 est. value
Sun Prairie, WI 53590

Inclusive Playgrounds for Rennebohm Park and Warner Park
New Construction
Post-Bid
Madison, WI 53705

Grading and Paving of Concessions Area and Stormwater
Results
$150,000 to $175,000 est. value
Middleton, WI 53562

Wetmore Park Splashpad and Playground
Results
Less than $1,000,000 est. value
Sun Prairie, WI 53590

Playground Design at Sunnybrook Park
Results
$55,000 est. value
De Forest, WI

Last Updated 09/10/2021 11:00 AM
Project Title

Olin Park Building Improvements

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract is for improvements to the Olin Park Facility located at 330 E Lakeside Street in Olin Park. The work includes, but is not limited to, replacement of mechanical, electrical and plumbing systems, installation of fire suppression system, installation of entrance elevator, and interior framing and related finishes.

Details

Park/Playground, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents