Similar Projects
Generator Installation
Results

Utility Services Facilities Lighting Post Storm Repairs
Results
Less than $750,000 est. value
Southport, FL 32409

AWT Switchgear Replacement Project
Results
Less than $1,200,000 est. value
Panama City, FL 32403

Thomas Drive Street Lighting Materials
Results
Less than $70,000 est. value
Panama City, FL 32401

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

WWTF Generator Replacement Radiator
Results
Panama City Beach, FL 32413

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

Abbott Building Generator Provisions for Gulf Coast State College - North Bay Campus
Results
Less than $87,845 est. value
Southport, FL 32409

Electrical Work
Results
Less than $234,813 est. value
FL

Emergency Portable Generators
Term Contract
Results

SIMS Automatic Transfer Switch Addition
Results
Panama City, FL 32404

225 McKenzie Avenue Renovations - Electrical
Results
Less than $300,000 est. value
Panama City, FL 32401

Main Gate Electronic Sign
Post-Bid
Panama City Beach, FL 32407

Bldg 110 Electronic Sign
Post-Bid
Less than $23,000 est. value
Panama City, FL 32407

WWTF Generator Replacement Radiators
Post-Bid
Panama City Beach, FL 32413

Last Updated 12/11/2020 04:09 PM
Project Title

Emergency Horn System

Physical Address View project details and contacts
City, State (County) Panama City, FL 32403   (Bay County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a project to repair and restore the Emergency Alert System in the MSA Area damaged as a result of Hurricane Michael. Associated areas of repair are identified within this performance work statement. The project is comprised of installing three concrete poles, in the MSA Area with Emergency Horn System (e.g. Klaxon, Whelen, etc.) on each, installing exterior manual alert stations in various areas on the site, and installing several interior manual alert stations in facilities that are not scheduled for demolition. The entire performance work statement is listed with specific tasks in Performance Work Statement (Appendix A).

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents