Similar Projects
Last Updated | 05/13/2020 11:26 AM |
Project Title | Spanish Fork Ne Irrigation Pipeline |
Physical Address | View project details and contacts |
City, State (County) | Spanish Fork, UT (Utah County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | No Responses Submitted, Project to Rebid |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is to install approximately 19,500 feet of new pressure irrigation pipeline ranging from 16-inch to 24-inches along the existing Powerline corridor to improve pressures throughout the system. The project includes two river crossings where the pipe will be installed across a new pedestrian bridge and a new traffic bridge; crossing of Highway 6 and Highway 147 which will require UDOT coordination; a new filter building and PRV; one railway crossing under a Union Pacific railway and connection into their existing system. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |