Similar Projects
Kisker And Route 364 Self Storage
New Construction, Infrastructure - 124,032 SF
Conception
$14,000,000 CJ est. value
Saint Peters, MO 63376

Lowe's Tool Rental Expansion
Addition, Demolition, Infrastructure - 3,196 SF
Design
$1,200,000 CJ est. value
Saint Charles, MO 63301

Tidal Wave Car Wash / St Peters
New Construction, Infrastructure - 5,400 SF
Design
$1,400,000 CJ est. value
Saint Peters, MO 63376

Wright City East Elementary School Addition
Addition, Demolition, Infrastructure - 5,300 SF
Bidding
$1,600,000 CJ est. value
Foristell, MO 63348

Wolfrum Road Trail Extension
Infrastructure
Bidding
$250,000 CJ est. value
Weldon Spring, MO 63304

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

Technology Drive / Multi-Residential
New Construction, Infrastructure
Construction
$54,000,000 CJ est. value
Lake Saint Louis, MO 63367

Reserve at St. Peters
New Construction, Infrastructure
Pending Verification
$53,000,000 CJ est. value
Saint Peters, MO 63376

The Chabad Jewish Center / St Charles County
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cottleville, MO 63366

Little Sunshine's Playhouse & Preschool
New Construction, Infrastructure - 11,354 SF
Design
$2,000,000 CJ est. value
Lake Saint Louis, MO 63367

Busch (August A) Mem CA Lake 33 and 34 Floating Dock Replacement
Infrastructure
Bidding
$55,000 CJ est. value
Augusta, MO 63332

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Last Updated 11/16/2022 04:14 PM
Project Title

O2B Kids Daycare Facility / Wentzville

Physical Address View project details and contacts
City, State (County) Wentzville, MO 63385   (Saint Charles County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Pre-School/Daycare, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The site plan was presented to the Wentzville Planning commission November 1, 2022. Information regarding contractor has yet to be determined. A firm construction timeline has not been set, however construction is not expected to begin prior to mid to late 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 10,910 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents