Similar Projects
RFQ Engineering - Engineering Services Related for the Removal of Per- and Polyfluoroalkyl Substances at the Crooked Springs Water Treatment Plant
Infrastructure
Conception
$10,000,000 CJ est. value
N Chelmsford, MA 01863

Arlington Street Mixed Use Building
New Construction, Infrastructure - 14,300 SF
Conception
$2,000,000 CJ est. value
East Watertown, MA 02472

St Benedict Classical Academy New Building
New Construction
Design
$8,000,000 est. value
Natick, MA 01760

Concrete Repairs Bourne & Sagamore Bridges, Cape Cod Canal, Bourne
Infrastructure
Design
$5,000,000 CJ est. value
Concord, MA 01742

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Bidding
$20,000,000 CJ est. value
Boston, MA 02203

Construction of Modular Office Buildings and Associated Site Work at the Vine Street and West Grove Street (Route 28) Maintenance Depots
New Construction, Infrastructure
Bidding
$1,387,180 CJ est. value
Middleborough, MA 02346

Welcome to Medford Sign Replacement Project
Infrastructure
Sub-Bidding
$61,920 CJ est. value
Medford, MA 02155

Gerow Recreation Area Phase 1 Park Improvements
Post-Bid
$1,100,000 est. value
Concord, MA

Land Clearing Management
Post-Bid
Hanscom A F B, MA

Tennis Court Replacement at War Memorial Recreation Center
Results
$435,000 est. value
Cambridge, MA 02138

Dilboy Stadium Turf and Track Renovation
Results
$935,714 est. value
Somerville, MA 02144

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Central Square Mixed-Use Development
New Construction, Build-out, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Chelmsford, MA 01824

St. Andrews Episcopal Church Solar Canopy
Alteration
Pending Verification
Framingham, MA 01702

Last Updated 08/08/2022 04:02 PM
Project Title

Demolition of Playground and Soil Remediation

Physical Address View project details and contacts
City, State (County) Ayer, MA 01432   (Middlesex County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Town of Ayer, Massachusetts Demolition of Playground and Soil Remediation the Town of Ayer Department of Public Works (Owner) Will Accept Sealed Bids for the Demolition of Playground and Soil Remediation at Pirone Park. The Work Involves Demolition of the Existing Wooden Playground Structures, Associated Footings, and Fencing, Felling of Trees and Removal of Stumps and Removal, Protection of Remaining Trees, Excavation (Machine and Hand/vacuum) and Off-site Disposal of Arsenic-impacted Soil, and Limited Backfilling. The Bidding and Award of This Contract Will Be Under the Provisions of M.g.l. Chapter 30, Section 39m. Complete Instructions for Filing Bids Are Included in the Instructions to Bidders. Minimum Wage Rates as Determined by the Commissioner of Department of Workforce Development Under the Provisions of M.g.l., Chapter 149, Section 26 to 27d, as Amended, Apply to This Project.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents