Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Palm River Public Utilities Renewal Project Areas 1 and 2
Infrastructure
Design
$14,586,966 CJ est. value
Naples, FL 34120

Sidewalk/Milling and Resurfacing/Base Work
Infrastructure
Design
$4,361,899 CJ est. value
Everglades City, FL 34139

Golden Gate City Transmission Water Main Improvements - Phase 1
Infrastructure
Bidding
$14,380,000 CJ est. value
Golden Gate, FL 34116

Churchill Circle Water Main Replacement
Infrastructure
Bidding
$1,470,000 CJ est. value
Naples, FL 34116

10th Street North Landscape and Irrigation Improvements
Infrastructure
Sub-Bidding
$270,000 CJ est. value
Naples, FL 34103

10th Street North Landscape and Irrigation Improvements
Infrastructure
Sub-Bidding
$270,000 CJ est. value
Naples, FL 34103

Resurfacing Courts at Various County Parks Project
Post-Bid
Naples, FL

Paver Maintenance
Post-Bid
Naples, FL

San Marco Road Shared Pathway (from Vintage Bay Drive to Goodland Drive)
Results
Marco Island, FL 34145

Annual Street Resurfacing
Results
Marco Island, FL

Temple Shalom Community Facility - Sitework
New Construction
Construction
$100,000 est. value
Naples, FL 34116

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

Logan Blvd and Treeline Drive Intersection Improvements
Infrastructure
Design
$1,332,000 CJ est. value
Naples, FL 34119

MPS 302 Force Main Replacement
Demolition, Build-out, Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Naples, FL 34112

Last Updated 08/17/2022 04:06 PM
Project Title

Annual Street Resurfacing

Physical Address View project details and contacts
City, State (County) Marco Island, FL 34145   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,639,076 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of milling one-inch (1") of existing pavement surface (both full width and edge), installation of an asphalt leveling course and the construction of a two-inch (2") Hot Bituminous Asphalt Concrete overlay at the following locations: 1. North Barfield Drive in between North Collier Boulevard and San Marco Road (approximately 2 miles) 2. Copperfield Court and the side streets (approximately 1.45 miles) Also included are manhole and valve adjustments, temporary pavement striping, raised pavement markers and thermoplastic striping, along with the transitions with side streets. The work shall be in accordance with the current edition of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Bid Bond 5% Pre/bid Proposal Conference Non-mandatory - N/A Also included are manhole and valve adjustments, temporary pavement striping, raised pavement markers and thermoplastic striping, along with the transitions with side streets. The work shall be in accordance with the current edition of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Please direct questions to Lina Upham, Purchasing and Risk Manager/Deputy City Clerk at: LUpham@cityofmarcoisland.com; or (239) 389-5011; or 50 Bald Eagle Drive, Marco Island, Florida 34145. Any existing surface or subsurface improvements, including, but not limited to, pavements, curbs, sidewalks, pipes, utilities, footings, structures, trees and shrubbery, not indicated in the Contract Documents to be removed or altered, shall be protected by Contractor from damage during the prosecution of the Work. Any such improvements so damaged shall be restored by Contractor to the condition equal to that existing at the time of Contractor's commencement of the Work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents