Similar Projects
Davis Creek Elementary School Construction
New Construction
Conception
Huntington, WV

New Central Elementary School
New Construction
Conception
$18,000,000 est. value
Charles Town, WV

Ranson Elementary Construction
New Construction
Design
Ranson, WV

New Primary School
New Construction
Design
$9,600,000 est. value
Princeton, WV

Greenhouse Proposal
Infrastructure
Bidding
$220,000 CJ est. value
Barboursville, WV 25504

Ruthlawn Elementary School Renovations
Addition - 2,877 SF
Post-Bid
South Charleston, WV 25309

New Ranson and Shepherdstown Elementary Schools
New Construction, Infrastructure - 136,000 SF
Post-Bid
$20,000,000 CJ est. value
Ranson, WV 25438

1055 Market Street
Renovation
Results
WV 26003

Toilet Renovations and Additions to Wayne County Schools
Renovation, Addition - 4,873 SF
Results
Wayne, WV 25570

The Deck
New Construction - 14,536 SF
Construction
$2,000,000 est. value
Morgantown, WV 26505

Safer School Entrances - 2022 Bond - Berkeley County Schools
Renovation
Pending Verification
$4,425,000 CJ est. value
Martinsburg, WV 25401

High Technology Park Office
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Fairmont, WV 26554

4th Avenue Commercial Building
Renovation - 29,000 SF
Conception
Huntington, WV 25728

Airport Lots Development
Addition, Build-out, Infrastructure - 80,000 SF
Design
$17,000,000 CJ est. value
Martinsburg, WV 25401

Warehouse and Offices
Renovation, Addition - 28,700 SF
Post-Bid
Kearneysville, WV 25430

Last Updated 04/11/2023 08:06 AM
Project Title

Roof Repairs at Milton Pre-K and the Central Office

Physical Address View project details and contacts
City, State (County) Milton, WV 25541   (Cabell County)
Category(s) Commercial, Education
Sub-Category(s) Elementary School, Office
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cabell County School Systemis seeking bids for roof repairs at Milton Pre-K and the Central Office. The Method of Contractor Selection has not been determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents