Similar Projects
Habitat for Humanity Homes
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Macon, GA 31201

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

Hotel Anne
New Construction, Infrastructure - 41,000 SF
Design
$10,000,000 CJ est. value
Savannah, GA 31401

Bryant Landing - Phase 1
Demolition, New Construction, Infrastructure, Renovation
Design
$10,000,000 CJ est. value
Statesboro, GA 30458

Widening and Reconstruction on US 80/SR 26 (Ogeechee Rd)
Infrastructure
Bidding
$58,736,853 CJ est. value
Savannah, GA 31405

RFP Engineering - Max Lockwood Drive
Infrastructure
Bidding
$300,000 CJ est. value
Statesboro, GA 30458

Max Fitness / Macon
New Construction, Infrastructure - 40,703 SF
Post-Bid
$12,000,000 CJ est. value
Macon, GA 31210

Convention Center Hotel Development
New Construction, Infrastructure - 160,000 SF
Post-Bid
$4,000,000 CJ est. value
Savannah, GA 31401

Rockingham Farms Water and Sewer Extension
Infrastructure
Results
Savannah, GA

6th Street Water Main
Infrastructure
Results
Auburn, GA

Hwy 55 / Kingsland
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Kingsland, GA 31548

New Mission Road Elementary School
New Construction, Infrastructure - 102,635 SF
Construction
$30,000,000 CJ est. value
Cartersville, GA 30120

CHI Memorial Hospital
New Construction, Infrastructure
Pending Verification
$134,500,000 CJ est. value
Ringgold, GA 30736

Restoration Hotel
LEED Certification, New Construction, Renovation, Infrastructure - 27,509 SF
Pending Verification
$8,500,000 CJ est. value
Savannah, GA 31401

Rocky Creek Sewer Lines and the Riverside Basin Sewer Project - Macon Water Authorit
Infrastructure
Conception
$28,000,000 CJ est. value
Macon, GA 31201

Last Updated 04/04/2023 11:01 PM
Project Title

Water Facility Improvements

Physical Address View project details and contacts
City, State (County) Greenville, GA 30222   (Meriwether County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $748,268 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

State of Georgia Utility Contractor License and must employ a state "Utility Manager" certificate holder who will have oversight of all the work. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Approximately 12,000 linear feet of new 10-inch, 8-inch and 6-inch water main, complete with valves, fire hydrants, service connections and other appurtenances. Time allotted for construction is 335 consecutive calendar days for substantial completion and 365 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. This is a Section 3 Covered Project under the HUD Act of 1968 and Section 3 Residents and Business Concerns are encouraged to apply. The City of Greenville, Georgia is committed to providing all persons with equal access to its services, programs, activities, education, and employment regardless of race, color, national origin, religion, sex, familial status, disability or age. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Greenville, Georgia, in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Greenville, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Greenville, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Upon receipt of all documents in undamaged condition within 30 days after the date of opening of bids, half of the deposit will be refunded. The difference between the deposit and the amount refunded represents the cost of reproduction. No refund will be made for documents received after 30 days or in damaged condition. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents