Similar Projects
Collection System Extension Nw Hickory
Bidding
Hickory, NC

On-Call Stormwater Control Measure Repair Services
Bidding

System A Storm Drain Improvements Project
Post-Bid
Harrisburg, NC 28075

Julia Avenue Culvert Replacement
Post-Bid
Belmont, NC 28012

Bethel Drive Trenchless Pipe Repair
Results
Salisbury, NC 28144

Storm Drainage Improvements
Results
Greensboro, NC 27401

Storm Water Repair and Improvement FY2021-F
Bidding
$4,147,144 est. value
Charlotte, NC

Storm-Damaged Drainage System Engineering Services and Construction Repair Project
Post-Bid
Apex, Kinston, NC 27502

Stormwater Replacement Project at 422 Carolina Avenue
Results
Shelby, NC 28151

1st Street Stormwater Improvements
Post-Bid
Beaufort, NC 28516

2020 Stormwater Infrastructure Repairs
Results
Less than $321,583 est. value
Durham, NC

Operation Maintenance and Mangement of Water and Wastewater Systems
Term Contract
Post-Bid
Wentworth, NC 27375

Storm Water Repair and Improvement FY 2020 D
Results
Less than $4,234,000 est. value
Charlotte, NC

Wastewater Collection System Rehabilitation Project
Post-Bid
Less than $1,200,000 est. value
Saint Pauls, NC

Storm Water Repair and Improvement FY20G
Results
Less than $4,233,733 est. value
Charlotte, NC

Reported 02/17/2021 12:00 AM
Project Title

Richard East Whitted Complex Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Hillsborough, NC 27278   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Richard E Whitted Complex Stormwater Improvements. Improvements include storm drainage network to collect roof drainage and rear yard drainage, foundation waterproofing along several buildings, landscaping enhancements, safety railing replacement, stone stair repair, new ADA ramp and retaining walls, dumpster corral, parking lot upgrades, building repointing at Recreation building.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents