Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Redmond 87
Demolition, New Construction, Infrastructure - 8,075 SF
Design
$50,000,000 CJ est. value
Redmond, WA 98052

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

2nd Avenue Mixed-Use Tower
Demolition, New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Seattle, WA 98101

Lake to Sound Trail - Segment C SeaTac - Rebid
Infrastructure
Results
$6,857,857 CJ est. value
Seatac, WA 98188

Jan Road Levee Setback
Infrastructure
Results
$9,449,449 CJ est. value
Issaquah, WA 98029

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

California Avenue Southwest Apartments
Demolition, New Construction, Infrastructure - 98,536 SF
Construction
$18,000,000 CJ est. value
Seattle, WA 98116

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

Eastrail Trail Connection at Spring Boulevard - City of Bellevue
Infrastructure
Post-Bid
$7,500,000 CJ est. value
Bellevue, WA 98005

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Results
$114,775,595 CJ est. value
Issaquah, WA 98029

Last Updated 08/16/2023 02:13 PM
Project Title

Sandy Cove Park Bank Protection Phase 1

Physical Address View project details and contacts
City, State (County) Snoqualmie, WA 98065   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

ESTIMATED PROJECT COST: $300,00 - $450,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For the construction of the Sandy Cove Bank Protection Phase 1 as shown on the plans and specifications. Bids received after the time fixed for opening cannot be considered. Due to Covid-19 pandemic, all sealed bids will be taken to the Parks and Public Works Department and opened. Bid results will be emailed to those contractors who bid on the project or who request a copy of the bid results. The City may reject any bid not accompanied by bid security or data required by the bid documents. A bid bond in the amount of 5% of the bid proposal must be submitted with the bid proposal. Factors considered in award of the contract will include the Contractor's experience and performance on previous contracts. All bid proposals shall be accompanied by a bid proposal deposit in certified check or cashier's check, or surety bond in an amount equal to five (5) percent of the amount of the Bid Proposal. Should the successful Bidder fail to enter into such contract and furnish satisfactory performance (contract) bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Snoqualmie. City of Snoqualmie reserves the right to accept a proposal of the bidder submitting the lowest responsible and responsive bid, to reject any or all bids, republish the call for bids, revise or cancel the work to be performed, or do the work otherwise, if the best interest of City of Snoqualmie is served thereby. City of Snoqualmie also reserves the right to postpone the bid award for a period of thirty (30) calendar days after bid opening, except that upon mutual consent of the lowest responsive, responsible bidder and City of Snoqualmie, the 30-calendar day limit may be extended to allow legislative approval of the bid award. Questions requiring a response are due no later than August 9th, 2023 at 11:00 AM. Questions requiring a response are due Clarifications by the City's Project Representative will be in the form of addenda to the Contract Documents and when issued will be sent as promptly as is practicable to all planholders. More information: Dylan Gambler, CIP Manager | dgamble@snoqualmiewa.gov | (425) 831-4919 The work consists of protecting the riverbank of Sandy Cove Park through the installation of a protective layer of gravel borrow, sandbags, coir bulk bags, coir erosion control fabrics, and seeding. All in-water construction completed within the 2023 in-water work fish window (Before October 15 th with possible extension to October 30 th, ).

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents