Similar Projects
Marina Inlet Culvert Replacement - Wisconsin Department of Natural Resources
Infrastructure
Design
$318,000 CJ est. value
Sherwood, WI 54169

New Holstein CTH X (Wisconsin Avenue) Reconstruction
Infrastructure
Bidding
$741,000 CJ est. value
New Holstein, WI 53061

Calumet County Park Bathhouse
Infrastructure
Bidding
$2,500,000 CJ est. value
Hilbert, WI 54129

2020 Street Urbanization
Infrastructure
Post-Bid
$2,807,504 CJ est. value
Hilbert, WI 54129

Bellin Health New Brillion Clinic
New Construction, Infrastructure - 15,990 SF
Post-Bid
$5,000,000 CJ est. value
Brillion, WI 54110

A New Fire Station
New Construction, Infrastructure
Results
$2,703,878 CJ est. value
Chilton, WI 53014

Sherwood Water Main/Service Upgrade
Infrastructure
Results
$40,700 CJ est. value
Chilton, WI 53014

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

RFP Engineering- Chilton- Hilbert
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hilbert, WI 54129

Asphalt Bridge Approaches - Appleton, Sth 441
Infrastructure
Pending Verification
$7,000,000 CJ est. value
Hilbert, WI 54129

Chilton New Stadium and Elementary School Addition and Renovations
Addition, Demolition, New Construction, Build-out, Infrastructure - 45,414 SF
Post-Bid
$4,000,000 CJ est. value
Chilton, WI 53014

2022 Utility and Street Improvements
Infrastructure
Results
$1,113,819 CJ est. value
Hilbert, WI 54129

Brillion Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Brillion, WI 54110

2023 Asphaltic Concrete Pavement
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Chilton, WI 53014

2022 Private LSL Improvements, A Safe Drinking Water Loan Program Project
Infrastructure
Results
$45,280 CJ est. value
Hilbert, WI 54129

Last Updated 03/29/2023 04:10 PM
Project Title

Chilton Salt Storage Building Construction Only

Physical Address View project details and contacts
City, State (County) Chilton, WI 53014   (Calumet County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $808,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Calumet County Salt Storage Building Construction Located west of the Chilton Highway Facility For Calumet County 241 E. Chestnut St. Chilton WI 53014 For the construction of a new Salt Storage Building at our Highway Facility. Salt Storage Building Construction for the Chilton Highway Facility Questions should be submitted to the Highway Commissioner's Office, 241 E. Chestnut St., Chilton, Wisconsin. Telephone (920) 849-1434 The right is reserved to reject any or all bids and to accept such a bid which may be most advantageous to Calumet County. Most advantageous includes a comparison of ability of the various bidders to perform. The decision of the Calumet County Highway Department to accept or reject bids shall be final, and cannot be questioned except on a showing of fraud. The work under this item shall consist of construction of a Wheeler Salt Storage Building in accordance with the bid plans. The building shall be weather tight and suitable for the storage of salt and other materials used for roadway abrasives. The building shall be rectangular with walls supported with external bracing to withstand lateral load of internal material piles. The building will also have a gable roof. The 4,000-ton facility will be able to hold salt along with two lean-tos one of which will be cold storage and the other will be for salt brine production and storage. The contractor will be responsible for the following: The contractor shall coordinate delivery of Wheeler building materials with the County and Wheeler representatives. Contractor will be responsible for unloading all materials upon delivery

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents