Similar Projects
7-Eleven
New Construction - 4,919 SF
Design
$150,000 CJ est. value
Forney, TX 75126

Dutch Bros Coffee - Tx1804 / Terrell
New Construction
Design
$750,000 est. value
Terrell, TX 75160

Paving and Drainage Improvements, Kaufman AEM
Infrastructure
Bidding
$250,000 CJ est. value
Kaufman, TX 75142

FM 1895 - Reconstruct Pavement and Add Shoulders
Infrastructure
Bidding
$11,020,861 CJ est. value
Kaufman, TX 75142

Grading Improvements for Eastland, Phases 1B and 1C
Infrastructure
Post-Bid
TX

Earthwork Improvements to Serve Arbordale Village 2
Infrastructure
Post-Bid
TX

Earthwork Improvements Windmill Farms 6B
Infrastructure
Results
Forney, TX

Grading Improvements for Eastland, Phases 1A and 2A
Infrastructure
Results
TX

Taco Bell
Renovation - 2,628 SF
Construction
$240,000 est. value
Kaufman, TX 75142

Thai Restaurant
Build-Out - 2,181 SF
Construction
$190,000 est. value
Forney, TX 75126

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Fatburger Renovation / Crossroads at Terrell
Renovation - 2,150 SF
Pending Verification
$500,000 est. value
Terrell, TX 75160

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Design
$696,000 CJ est. value
Kaufman, TX 75142

SH 34 - Reconstruction of Existing Roadway
Infrastructure
Bidding
$5,211,158 CJ est. value
Kaufman, TX 75142

Construction of the Grading Improvements or Wildcat Ranch, Phase 4
Infrastructure
Post-Bid
TX

Last Updated 10/03/2022 05:03 PM
Project Title

7-Eleven / Heartland

Physical Address View project details and contacts
City, State (County) Forney, TX 75126   (Kaufman County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 3, 2022, this project is in design. The architect has been identified, but information regarding the method of general contractor selection is unavailable. No firm construction timeline has been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 4,919 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents