Similar Projects
RFP - Architectural Firm - Lindenwold Public Schools
Term Contract
Conception
Lindenwold, NJ 08021

RFP - Architectural Firm - Lindenwold Public Schools
Term Contract
Conception
Lindenwold, NJ 08021

Toilet Room Renovation At Central Elementary School
Renovation
Design
$200,000 CJ est. value
Haddonfield, NJ 08033

Toilet Room Renovations at J. Fithian Elementary School
Renovation
Design
$200,000 CJ est. value
Haddonfield, NJ 08033

Office Space Renovations - Re-bid
Renovation
Bidding
$150,300 CJ est. value
Gibbsboro, NJ 08026

Office Space Renovations - Re-bid
Renovation
Bidding
$150,300 CJ est. value
Gibbsboro, NJ 08026

District Wide Facilities ADA Improvements (Phase III)
Renovation
Post-Bid

Gloucester Schools Security Vestibules
Renovation, Addition
Post-Bid
Blackwood, NJ

Roosevelt Stem School Additions and Renovations
Renovation, Addition
Results
Pennsauken, NJ 08109

Gloucester Schools Security Vestibules
Renovation
Results
Blackwood, Sicklerville, NJ 08081

Kindergarten Classroom Addition to the Kresson Elementary School
Addition - 14,300 SF
Construction
Voorhees Township, NJ 08043

2022 Bond - The Cherry Hill School District
Renovation
Pending Verification
$363,000,000 CJ est. value
Cherry Hill, NJ 08002

2022 Bond - The Cherry Hill School District
Renovation
Pending Verification
$363,000,000 CJ est. value
Cherry Hill, NJ 08002

Toilet Room Renovations at Haddonfield Memorial High School
Renovation
Design
$200,000 CJ est. value
Haddonfield, NJ 08033

Partial Field Restorations & Alterations Phase-01
Infrastructure
Bidding
$725,000 CJ est. value
Gloucester City, NJ 08030

Last Updated 08/12/2022 10:05 AM
Project Title

RFP - Environmental Inspection and Consulting Services - Lindenwold Public Schools

Physical Address View project details and contacts
City, State (County) Lindenwold, NJ 08021   (Camden County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected October 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of Education desires to appoint a firm to provide environmental inspection and consulting services for the school year. Applicants should demonstrate knowledge and experience with respect to aspects of environmental consulting services required by a school board. Any experience or aknowledge of matters that directly affect the Board of Education should be addressed. Respondents must be certified to provide environmental inspection and consulting services in the State of New Jersey. Provide AHERA mandated inspections of school buildings that have been identified as requiring inspection (noted below). a. Middle School - square footage 96,947b. School #4 - square footage 56,501c. School #5 - square footage 52,691d. Preschool - square footage approx. 28,700This includes the collection of available data for review and a surveillance inspection at each site in accordance with AHERA requirements. An inspection report specifying location, quality and condition of known asbestos-containing materials, and required corrective action will be provided to the district. The term of contract for Request for Proposal of Architectural Firm shall be from July 1, 2021 through June 30, 2022 All activities for this contract will be coordinated through the Administrative Offices of the Lindenwold Board of Education, 801 Egg Harbor Road, Lindenwold, NJ 08021 and addressed to Kathleen Huder, Business Administrator/Board Secretary, 856-783-0276 ext. 3102, khuder@lindenwold.k12.nj.us The Method of Contractor Selection has not been determined at this time.

Details

234,839 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents