Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

London Crossing
New Construction, Infrastructure - 32,600 SF
Design
$11,000,000 CJ est. value
Wheeling, IL 60090

HMA Surface Removal
Post-Bid
Wood Dale, IL

Alley Reconstruction - Section D
Post-Bid
Westmont, IL

Asphalt at Birch Park
Results
Hoffman Estates, IL 60169

Sealcoating and Striping at Various Locations
Results
Lake Zurich, IL

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Maple Area Improvements
Infrastructure
Post-Bid
Villa Park, IL

Pavement patching on h1-74 from the 1-74/1-80/1-280 Interchange to IL 81
Results
IL

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Roadway Pavement Rehabilitation
Infrastructure
Post-Bid
Hoffman Estates, IL

2021 Road Program
Results
Lake Zurich, IL

Auburn Park Station & Parking Facility
New Construction, Alteration - 4,678 SF
Construction
Chicago, IL 60620

Last Updated 12/19/2022 11:06 AM
Project Title

ADA Sidewalk Improvements along US 24 / IL 99

Physical Address View project details and contacts
City, State (County) Mount Sterling, IL 62353   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $303,142 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 19, 2022, the project has been awarded. A timeline for construction has not been confirmed. ADA sidewalk improvements along US 24 / IL 99 in Mt. Sterling. Region 4 District 6 Federal Project # STPC2HA(142) County(s) Brown Key Route(s) Various Marked Route(s) Section(s) D6 BROWN CO ADA State Job #(s) C-96-044-21 PPS #(s) 6-00784-0200 Completion Date: 40 Working Days Questions not accepted as of June 07, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 062 - ADA Sidewalk Improvements along US 24 / IL 99 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents