Similar Projects
NCAUR Exterior Building Repairs
Alteration
Bidding
$5,000,000 to $10,000,000 est. value
Peoria, IL 61604

Hansen Community Center Vestibule
Alteration
Bidding
Manhattan, IL

183 CES Replace Metal Fascia P-36
Post-Bid
Less than $25,000 est. value
Springfield, IL 62707

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Terminal Expansion - Phase 4 Signage
Renovation
Results
Rockford, IL 61109

2020 Water Pumping Station Exterior Facade Restoration
Results
$84,000 est. value
Homewood, IL 60430

Stair Improvements at Elgin High School
Alteration
Bidding
Elgin, IL 60120

Interior and Exterior Repairs
Post-Bid
Granite City, IL

Maywood Fine Arts Exterior Remodeling
Results
Maywood, IL 60153

Housing Rehabilitation - Deck Repair
Alteration
Bidding
Rock Island, IL 61201

Infiltration and Tuckpointing at Schurz
Post-Bid
Chicago, IL 60641

Repair/Replacement Overhead Door Headers, Replce Siding, Update Exhaust System and Wash Bays
Results
Springfield, IL 62706

Replace Architectural Panels
Post-Bid
Less than $900,000 est. value
East Peoria, IL

DNR Buel House- Repair Foundation Walls
Results
Springfield, IL 62702

Miscellaneous Exterior Work - 2021
Post-Bid
Columbia, IL 62236

Last Updated 06/28/2021 12:30 PM
Project Title

Housing Rehabilitation Program - Gutter Repairs

Physical Address View project details and contacts
City, State (County) Rock Island, IL 61201   (Rock Island County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project requires minor gutter and downspout repairs and install. The downspout on the Northeast corner of the porch needs flat straps, securing it to the wall. The Down on the Northwest corner needs rotated and proper straps installed securing it to the building. There’s a three-foot piece of fascia that blew off on the south rake. The piece is still on site, needs reinstalled. Add flip-up tails on all 5 of the downs, they should be minimum of four-foot.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents