Similar Projects
SR 400 Express Lanes
Bidding
Less than $13,000,000 est. value

I-285/I-20 West Interchange Project
Bidding
Atlanta, GA 31175

Sumner Dog Park Paving
Post-Bid
East Point, GA 30344

Church Street Trench Backfill and Resurfacing Improvements
Post-Bid
Palmetto, GA 30268

Southern Region Disaster Recovery Support BPA
Results

2019 LMIG Street Resurfacing Project
Results
Atlanta, GA 30303

Signing and Pavement Marking
Infrastructure
Bidding
GA

Prequalified Contractors List
Post-Bid
East Point, GA

Hot In Place Recycling Maintenance Activities
Results
Atlanta, GA 30303

Brumbelow Road at Tuckerbrook Lane Intersection Improvement
Infrastructure
Bidding
Johns Creek, GA 30022

Short Line Striping Project
Post-Bid
Milton, GA 30004

SR 9/Atlanta Street at Oxbo Road Intersection Realignment
Results
Less than $5,961,859 est. value
Roswell, GA

T32 - Routine Maintenance Services - District 7
Term Contract
Post-Bid

Bell Road at Mcginnis Ferry Road Intersection
Results
Johns Creek, GA

Park Signage for the Department of Parks and Recreation
Post-Bid
Atlanta, GA 30303

Last Updated 06/07/2021 08:44 AM
Project Title

Hopewell Road at Bethany Bend and Bethany Way Intersection

Physical Address View project details and contacts
City, State (County) Milton, GA   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,835,275
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Milton is accepting sealed bids from qualified firms for the Hopewell Road at Bethany Bend/Bethany Way Intersection Improvement Project for the Public Works Department in conformance with Title 32, Chapter 4, Article 4, Part 2 of the Official Code of Georgia Annotated. All work will be done in accordance with Georgia Department of Transportation’s (GDOT) Standard Drawings, Standard Specifications (current edition), and Pay Items Index as standards and specifications for the construction and completion of the work required. All bidders must comply with all general and special requirements of the bid information and instructions enclosed herein. To bid on this contract, the Contractor must be listed on the current Georgia Department of Transportation Pre-Qualified Contractors list. No exceptions. Additionally, the Contractor must have completed one roundabout within the past three (3) years. Bidders shall submit with the bid a qualification sheet listing project(s) that meet the experience requirement along with references. List should include project date, location, description, and contact information. The City of Milton reserves the right to reject any or all bid/proposals and to waive technicalities and informalities, and to make award in the best interest of the City of Milton. See attached document(s):

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents