Similar Projects
Lancaster Host Resort - Expo Center Parking
New Construction
Design
Lancaster, PA 17602

Leven Road Sitework
New Construction
Design
Lancaster, PA 17602

2020 Road Projects
Bidding
Denver, PA 17517

2020 Roadway Project - Contract 3 MS-963 - Bituminous Materials
Bidding
$20,000 to $30,000 est. value
Leola, PA 17540

Roadway Surface Mill, Wearing Course
Post-Bid
Marietta, PA

Ephrata Crossing Transportation Improvements
Post-Bid
Ephrata, PA 17522

Mount Joy Campus Paving Project
Results
Willow Street, PA 17584

2018 Seal Coat Treatment
Results
$18,000 to $24,000 est. value
Marietta, PA 17543

Park City Center Restaurants
New Construction, Demolition - 21,000 SF
Design
$1,750,000 est. value
Lancaster, PA 17601

2020 Roadway Project - Contract 2 Paving
Bidding
$190,000 to $240,000 est. value
Leola, PA 17540

E-3m Seal Coat In Place
Post-Bid
Quarryville, PA 17566

Bituminous Resurfacing
Results
PA

2020 Roadway Project - Contract 1 Bituminous Seal Coat
Bidding
$90,000 to $110,000 est. value
Leola, PA 17540

Asphalt Paving at Five Lukoil Service Stations
Renovation
Post-Bid

Walnut Street and Lockup Lane Storm Sewer and Green Alley Improvements
Results
$75,000 to $150,000 est. value
Lititz, PA 17543

Last Updated 05/23/2019 10:43 AM
Project Title

2019 Street and Alley Improvements

Physical Address View project details and contacts
City, State (County) Ephrata, PA 17522   (Lancaster County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 to $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description In general, the work shall consist of, but not be limited to, furnishing all required bonds, insurances and forms, general superintendence, labor, materials, equipment, appurtenances and incidentals required for completion of the prescribed street and alley reconstructions and mill and overlays, including, but not limited to, ADA ramp installations, storm water catch basin replacements, base repair areas, grading, base, binder and wearing course asphalt overlays, pavement markings replacement, traffic control including establishment of approved detour routes and all else necessary or required to complete the prescribed improvements. Total Size of Projects is approximately 11,440 square yards.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents