Similar Projects
Volcano Steak & Sushi
Renovation - 3,600 SF
Design
Maple Shade, NJ 08052

Marriott Towne Place Suites Hotel & Restaurant
New Construction - 3,500 SF
Design
Florence, NJ 08016

Starbucks at Hartford Square - Shell Renovation
Renovation - 2,000 SF
Post-Bid
Medford, NJ 08055

Re-Use and/or Development of the 225-Acre, Rowan College at Burlington County Pemberton Campus
Post-Bid
Pemberton, NJ 08068

Starbucks with Drive Thru - Shell
New Construction - 1,850 SF
Construction
$1,000,000 est. value
Lumberton, NJ 08048

Burger King
Renovation
Construction
Cinnaminson, NJ 08077

Main Street Mixed Use Development
New Construction - 12,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Lumberton, NJ 08048

Taco Bell
New Construction, Demolition
Pending Verification
Mount Laurel, NJ

Five Guys Burgers
Renovation
Design
Delran, NJ 08705

Five Guys Landlord Work
Renovation
Post-Bid
$200,000 est. value
Delran, NJ 08705

McDonald's Drive Thru and Parking Lot Renovations
Renovation - 4,481 SF
Construction
Medford, Medford Lakes, NJ 08055

Irick Road Mixed Use Development
New Construction
Design
Burlington, NJ 08016

Redevelopment of the Azalea Farm Property Block 1304 Lot 18 (Route 130)
Post-Bid
Cinnaminson, NJ 08077

Restaurant
New Construction - 2,800 SF
Construction
$600,000 est. value
Marlton, NJ 08053

Starbuck's Build Out
Build-Out - 2,000 SF
Design
Medford, NJ 08055

Last Updated 01/10/2019 01:48 PM
Project Title

Ambrosia Treatment Center - Phases I and II

Physical Address View project details and contacts
City, State (County) Medford, NJ 08055   (Burlington County)
Category(s) Commercial, Medical
Sub-Category(s) Food/Beverage Service, Nursing/Rehabilitation Center
Contracting Method
Project Status Construction Commenced April 2018, Construction Complete as of January 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The applicant is seeking a use variance to expand the treatment center in 2 phases. Phase 1 is a treatment facility with about 32 beds; Phase 2 will be a dining facility.
Details 17,880 SF - 1 Nursing/Rehabilitation Center, 12,080 SF Addition Building, 32 Unit(s), 1 Food/Beverage Service, 5,800 SF Addition Building.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents