Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Costa Verde Commercial Shopping Center Revitalization
Addition, Demolition, New Construction, Renovation, Infrastructure - 360,000 SF
Design
$170,000,000 CJ est. value
San Diego, CA 92122

Albertsons #0071 / Valley Center
New Construction, Infrastructure - 50,907 SF
Design
$8,000,000 CJ est. value
Valley Center, CA 92082

Construct Aux Lane, Compaction Grouting, RHMA, Landscape, Electrical
Infrastructure
Bidding
$46,000,000 CJ est. value
San Diego, CA 92111

Construct Aux Lane, Compaction Grouting, RHMA, Landscape, Electrical
Infrastructure
Bidding
$46,000,000 CJ est. value
San Diego, CA 92111

RFP Construction Manager - Construction Management for Alvarado 2nd Pipeline
Infrastructure
Post-Bid
$350,000 CJ est. value
San Diego, CA 92101

RFP Construction Manager - Construction Management for Alvarado 2nd Pipeline
Infrastructure
Post-Bid
$350,000 CJ est. value
San Diego, CA 92101

Bermuda Avenue Coastal Access Replacement
Infrastructure
Results
$2,132,000 CJ est. value
San Diego, CA 92107

Pure Water Program (PWP) Morena Conveyance South & Middle and Morena Conveyance Bike Lanes
Infrastructure
Results
$116,300,000 est. value
San Diego, CA 92101

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

Pacific View Academy of Arts Encinitas California
New Construction, Build-out, Renovation, Infrastructure - 15,273 SF
Construction
$2,000,000 CJ est. value
Encinitas, CA 92024

The Trails At Carmel Mountain Ranch
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
San Diego, CA 92101

Ocean Kamp
New Construction, Infrastructure - 126,400 SF
Pending Verification
$390,000,000 CJ est. value
Oceanside, CA 92054

Carmel Mountain Road Fire Station - San Diego Fire-Rescue Department
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
San Diego, CA 92129

Last Updated 08/24/2023 02:09 PM
Project Title

Boone Elementary School - Joint Use Field (LLB)

Physical Address View project details and contacts
City, State (County) San Diego, CA 92114   (San Diego County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Athletic Facility, Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $3,100,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of renovating an existing decomposed granite play field into a JointUse Field for the community during school off hours. Work includes the following: Replace existing decomposed granite play fields with natural turf. Install new asphalt walking track around natural turf field. Construction of new 10-0 high chain link fence and gate(s) to separate and secure the school campus from the proposed joint use field. Installation of a new concrete sidewalk for accessible pedestrian access from the Right-of-Way. AC Grind and Overlay & reconfiguration of striping at existing playground. Prevailing wage requirements apply to all public works projects and must be followed per Article 17 of the General Conditions of the Request for Proposals. The applicable prevailing wage determination during construction is the one in effect on the date the GMP is first published in a newspaper of general circulation BID BONDS: Bid Bonds are NOT required for this project. Project Estimate: is between $2.9 Million and $3.1 Million The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding process. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents