Similar Projects
Donlin Gold Natural Gas Pipeline
New Construction, Infrastructure
Conception
$1,122,300,000 CJ est. value
Anchorage, AK 99501

Donlin Gold Natural Gas Pipeline
New Construction, Infrastructure
Conception
$1,122,300,000 CJ est. value
Anchorage, AK 99501

Anchorage Senior Center Garage Addition
New Construction, Infrastructure
Design
$500,000 CJ est. value
Anchorage, AK 99501

Trail River Bridge 25.7 and Falls Creek Bridge 25.4 Replacements
Demolition, New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Anchorage, AK 99501

AK Anchorage T 2016(1), Connecting Anchorage Trail Improvements
New Construction, Infrastructure
Bidding
$3,186,592 CJ est. value
Anchorage, AK 99501

Port Of Alaska Utility Locates
Alteration
Post-Bid
Less than $50,000 est. value
Anchorage, AK

Utilities for Temporary Facilities (Bldg 21309)
Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Anchorage, AK

Wharf Heat Trace Modifications Design Build Services
Alteration
Results
Anchorage, AK

Electron Drive Crossing Upgrades
Infrastructure
Results
$104,200 CJ est. value
Anchorage, AK 99518

Providence Drive Resurfacing - Lake Otis Parkway to Elmore Road - Project A - Municipality of Anchorage
Infrastructure
Pending Verification
$2,600,000 CJ est. value
Anchorage, AK 99508

Wonder Park Elementary School Replacement - Anchorage School District
New Construction, Infrastructure
Conception
$33,001,000 CJ est. value
Anchorage, AK 99508

Construct Mental Health Building and Surface Parking Alaska
Addition, Demolition, Infrastructure, Renovation
Bidding
$20,000,000 CJ est. value
Anchorage, AK 99504

RFP D/B - Port of Alaska North Extensions Stabilization Step 1
Infrastructure
Post-Bid
Anchorage, AK 99501

Anchorage Water and Wastewater Utility (AWWU) Surface Restoration Contract
Infrastructure
Results
$1,301,725 CJ est. value
Anchorage, AK 99501

Anchorage Senior Activity Center Renovations Phase II - PW2012053 - Municipality of Anchorage
Addition, Demolition, Renovation, Infrastructure
Conception
$1,350,000 CJ est. value
Anchorage, AK 99501

Last Updated 09/07/2022 11:32 AM
Project Title

Norm Drive Storm Drain Replacement

Physical Address View project details and contacts
City, State (County) Anchorage, AK 99507   (Anchorage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,268,279 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 7, 2022, project was awarded to Mass Excavation, Inc , awarded amount is $1,268,279.40.** Consisting of approximately 770 S.Y. of Sidewalk and Concrete Apron Removal and Replacement; 7 Curb Ramps; 1,600 L.F. of Curb and Gutter Removal and Replacement; 410 Tons of A.C. Pavement; 3,500 S.Y. of Pavement Removal; 7 Catch Basins; 6 Storm Drain Manholes; 1 Storm Drain Catch Basin/Manhole; 855 L.F. of Storm Pipe Removal and Replacement; and other related work. ESTIMATED CONSTRUCTION COST: Between: $1,000,000 - $3,000,000 Site Visit: N/A Pre-Bid Conference: N/A Questions Due: 12:00 P.M. Local Time, July 12, 2022 Requests for interpretation or clarification of the bidding Documents shall be made in writing to the Purchasing Office (wwpur@muni.org). Please reference the Invitation to Bid Number & Project Title. Do not contact the specified department directly. Bid Bond, certified check, cashiers check, money order or cash shall be submitted with the bid in the amount indicated. To maintain the project schedule, Interpretations, corrections, or changes to the Bidding Documents shall be made by Addendum and shall not be binding unless included in the Addendum. It is your responsibility to periodically check the website for addenda. The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. No bidder may withdraw his bid after the hour set for the opening of bids or before the award of contract unless said award is delayed for a period exceeding forty-five (45) days from the time of the opening. The Municipality shall not be responsible for bid preparation costs, nor for costs, including attorney fees, associated with any (administrative, judicial or otherwise) challenge to the determination of the lowest responsive and responsible bidder and/or award of contract, and/or rejection of bids. By submitting a bid, each bidder agrees to be bound in this respect and waives all claims to such costs and fees. Contracts shall be awarded by written notice issued by the Purchasing Officer to the lowest responsive and responsible bidder; however, preference will be given to local bidders in compliance with Anchorage Municipal Code Section 7.20.040. The Municipality of Anchorage assumes no responsibility for any interpretations or presentations made by any of its officers or agents unless such interpretations or presentations are made by written addendum to this Invitation to Bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents