Similar Projects
Road Paving Mill and Fill
Infrastructure
Bidding
$205,000 est. value
Cheshire, MA

Paving 2021
Infrastructure
Bidding
Lee, MA 01238

2020 West Center Road Paving
Post-Bid
Less than $560,000 est. value
West Stockbridge, MA

2020 Cold In-Place Recycle Main Road
Post-Bid
Less than $182,090 est. value
Tyringham, MA

Resurfacing and Related Work on a Section of Route 2 (Mohawk Trail)
Results
Less than $5,312,000 est. value
Florida, Savoy, MA 01247

Resurfacing and Related Work at Various Locations
Results
Less than $6,275,654 est. value

West Center Road Repair
Infrastructure
Bidding
$18,000 est. value
Otis, MA 01253

2020 Resurface Main Road
Post-Bid
Less than $182,090 est. value
Tyringham, MA

Maple Drive Road Paving - Top and Binder Bituminous Concrete and/or Full Depth Reclamation
Results
$115,374 est. value
Cheshire, MA

Paving Various Roads
Post-Bid
Less than $230,000 est. value
Stockbridge, MA 01262

Dalton Paving and Related Work
Results
Less than $650,000 est. value
Dalton, MA

Road Crack Sealing
Term Contract
Post-Bid
Pittsfield, MA

Resurfacing and Related Work on Route 43 (Green River Road)
Results
Less than $2,766,281 est. value
Williamstown, MA 01267

Road Crack Purchase and Service for Various Participating Towns
Term Contract
Post-Bid
$430,000 est. value
Pittsfield, MA

Resurfacing and Related Work on A Section of Route 20 (Park and Housatonic Streets)
Results
Less than $883,683 est. value
Lee, MA 01238

Last Updated 10/06/2021 09:23 AM
Project Title

Full Depth Reclamation & Paving of Dimmock, Ed Jones, Merritt, & Judd Roads

Physical Address View project details and contacts
City, State (County) Otis, MA 01253   (Berkshire County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $418,677
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of four sections totaling approximately 24,360 Sq. YDs FDR of the existing blacktop surface, calcium chloride at a rate of 1 Gal. per sq. yard, and the application of a HMA Binder course of two inches and HMA top course of one and a half inches approximately 4690 tons. Tack coat at a rate of .05 gallons a square yard in between courses along with a Wedge joint to be installed on both layers of HMA as well. Traffic control to be provided by the town and work is to be completed by October 30, 2021 unless weather permits otherwise

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents