Similar Projects
2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Simi-Calcine Dolomite (AKDOLIT)
Term Contract
Sub-Bidding
Pittsburgh, PA 15219

Pave in Place Projects
Infrastructure
Sub-Bidding
$425,000 CJ est. value
Hamburg, PA 19526

Inlet Precast Concrete Galvanized
Alteration
Post-Bid
Everett, PA 15537

Construction of a Sludge Transfer Bed
Alteration
Post-Bid
Brookville, PA

Tyrone Area High School Loading Dock Renovations Project - General Construction
Results
Less than $184,000 est. value
Tyrone, PA 16686

Concrete New and Replacement
Results
Downingtown, PA

Memorial Park Stadium Reconstruction Quakertown Borough
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Quakertown, PA 18951

Concrete New and Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Downingtown, PA 19335

Precast Concrete Inlets and Risers
Alteration
Post-Bid
Carnegie, PA

Borough Garage Concrete Pad Project
Alteration
Results
Robesonia, PA

Toby Farms Intermediate School HVAC and Window Upgrades
Renovation
Bidding
$13,600,000 CJ est. value
Brookhaven, PA 19015

Fairview Hills Concrete Revitalization Project Phase II
Alteration
Post-Bid
Altoona, PA 16601

Last Updated 04/10/2023 10:07 AM
Project Title

Mifflin County Campus Transportation Enhancements -Rebid

Physical Address View project details and contacts
City, State (County) Lewistown, PA 17044   (Mifflin County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $303,840 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of streetscape enhancement adjacent to the Mifflin County Campus. The County intends to enter into two contracts for such - General Construction and an Electrical Construction (which are subject to the Pennsylvania Prevailing Wage Act if over $25,000). Bidders can view the Project Manual at the reception counter of the Mifflin County Commissioners Office or through various construction plan services. Proposals shall be accompanied by a Bid Bond, Cashiers Check, Trust Company Treasurers Check or Certified Check made payable to Mifflin County in an amount of not less than ten percent (10%) of the Bid proposal. No Bidder may withdraw a bid within thirty (30) days after the actual date of the opening thereof. The Mifflin County Commissioners reserve the right to reject any bids, or to waive any informality in the bid process when it is in the best interest of Mifflin County and may reject the bid of any bidder who they determine is not qualified to perform the Contract. The construction duration is currently scheduled to start approximately April 10, 2023 and be fully complete by September 15, 2023. Bid Results CONTRACT #1 (GC) - CONTRACTOR Bowman Excavation/Paving/Concrete - $303,840.34 CONTRACT #2 (EC) - CONTRACTOR Lepley Electric - 127,600.00

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents