Similar Projects
Remove, Supply and Install Three Inverters/Heat Pumps
Term Contract
Bidding
Babylon, NY 11702

Well Pump No. 1 Booster Pump, and Transfer Pump Replacement
Infrastructure
Bidding
Roslyn Heights, NY

Furnish Hidrostahl Submersible Pump at Thomas Creek Pump Station
Post-Bid
Fairport, NY 14614

Installation of Well Pump Well 2
Post-Bid
Beacon, NY 12508

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Pump
Post-Bid
White Plains, NY 10601

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Pumps, Pump Parts and Accessories for Heating and Cooling Applications as Specified
Term Contract
Post-Bid
Syracuse, NY 13202

Town of Watson Water District #4 Extension #1
Results
Less than $6,000,000 est. value
Lowville, NY 13367

Pumps-Furnish and Deliver Submersible Non-Clog Pumps Cornell 6NHTA
Term Contract
Post-Bid
Pomona, NY 10970

Complete Turnkey Rebuilding of an Existing Sulzer/Johnston Vertical Turbine Pump
Results
Millwood, NY 10546

Pump Seals
Post-Bid
Yonkers, NY 10701

Furnish Submersible Pumps as Specified
Term Contract
Results
Syracuse, NY 13202

Backwash Pumps and VFD`s Replacement for the Water Treatment Plant
Post-Bid
Oneonta, NY 13820

Last Updated 09/03/2021 09:11 AM
Project Title

2021 Hotchkiss Street Pump Station

Physical Address View project details and contacts
City, State (County) Binghamton, NY   (Broome County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal, Procurement and Installation of a New Centrifugal Pump and Motor at Hotchkiss Street Pump Station. The pump to be installed shall be an Aurora model 421 split case with 75 HP motor pump and baseplate rated at 400 GPM @ 440 TDH or approved equal.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents