Similar Projects
Last Updated | 07/20/2022 11:33 PM |
Project Title | Storm Damage Repair to Dyerville Loop Road (6D100) PM 1.10, 1.20, 1.64, 2.03-2.19 and Fort Seward Road (C7C010) PM 5.45 |
Physical Address | View project details and contacts |
City, State (County) | Eureka, CA (Humboldt County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results, |
Bids Due | View project details and contacts |
Estimated Value | $631,326 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be done consists of traffic control systems, removing existing culverts, installing new culverts and down-drains, armoring culvert outlets with rock slope protection, constructing a gabion wall, placing rock slope protection along roadway retreat, reconstructing the roadway, and erosion control items. Bidders are advised that the work must be completed within 50 working days. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |