Similar Projects
Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

Brian Head Town Trail Phase 3 Project
Infrastructure
Design
$80,000 CJ est. value
Brian Head, UT 84719

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Storm Drain Improvements Project - Center Street Concrete Inlet and Outlet Structures 2022
Infrastructure
Post-Bid
$400,000 CJ est. value
Cedar City, UT 84720

Construction-Pre Qualified General - Cedar City Building Concrete Replacement
Infrastructure
Results
$278,900 CJ est. value
Cedar City, UT 84720

Well Equipping Project
Infrastructure
Results
$499,410 CJ est. value
Cedar City, UT 84720

Commerce Crossroads Logistics Park
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Cedar City, UT 84721

Toboggan Lane and Snowman Drive Waterline Project
Infrastructure
Design
Brian Head, UT 84719

CICWCD Test Well and Vandenberghe Well Projects
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Cedar City, UT 84720

DFCM Construction Pre-qualified General Contractors Southern Utah University (SUU) Valley Farm New Stock Building
New Construction, Infrastructure
Results
$612,500 CJ est. value
Cedar City, UT 84720

Canyon Sewer Line Capacity Project
Infrastructure
Design
$500,000 CJ est. value
Brian Head, UT 84719

800 South Water Tank
Infrastructure
Post-Bid
$500,000 CJ est. value
Cedar City, UT 84720

Kitty Hawk Dr & Airport Rd Signal Project
Infrastructure
Results
$176,266 CJ est. value
Cedar City, UT 84721

Drilling of a culinary well to replace the current one
Infrastructure
Post-Bid
$150,000 CJ est. value
Beryl, UT 84714

Thunderbird Way Storm Drain / ADA Sidewalk Project
Infrastructure
Results
$1,654,278 CJ est. value
Cedar City, UT 84720

Last Updated 09/08/2023 09:03 AM
Project Title

Sunrise Ave. to Coal Creek Storm Drain Project

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84721   (Iron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $439,142 [brand] Estimate
Plans Available from Agency's Affiliate - 07/03/23
Owner View project details and contacts
Architect View project details and contacts
Description

Cedar City is accepting separate sealed BIDS for the Sunrise Ave. to Coal Creek Storm Drain Project according to specifications prepared by the City. The right is reserved by Cedar City to reject any and all Bids. 385 E. SUNRISE AVE TO PAIUTE DR CEDAR CITY, UTAH 84721\ Provide materials as indicated and all labor and equipment necessary to construct the SUNRISE AVE. TO COAL CREEK TO STORM DRAIN PROJECT as detailed in the project plans and specifications. Installation of 42", 36" and 24" corrugated plastic pipe including storm drain manholes from Sunrise Ave to Coal Creek; a portion of the project being on the Paiute Indian Tribe property. Installation Location: 1480 W Center Street Cedar City, Utah 84720

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents