Similar Projects
Terminal Roof Replacement
Renovation
Sub-Bidding
$180,000 CJ est. value
Henderson, KY 42420

Kentucky Correctional Industries Frankfort Roof Replacement
Renovation
Sub-Bidding
$583,000 CJ est. value
Frankfort, KY 40601

Carter County Maintenance Garage Roof Overlay
Post-Bid
$67,000 est. value
Carter, KY

Reroof Newport Intermediate School
Post-Bid
Less than $420,110 est. value
Newport, KY 41071

Partial Roof Replacement at Various Schools
Renovation
Results
Louisville, KY 40203

Partial Roof Replacement at Newcomer Academy
Results
Louisville, KY 40218

Toombs Court and Latimer Heights Roof Replacement
Renovation
Construction
$390,000 CJ est. value
Danville, KY 40422

DMA London Roof Replacement
Renovation - 16,150 SF
Sub-Bidding
$600,000 CJ est. value
London, KY 40741

Somersplash Roof Repair
Post-Bid
Somerset, KY 42503

Partial Roof Replacement at Seneca High School
Results
Louisville, KY 40220

Replacement of Roof at Mausoleum
Renovation
Sub-Bidding
$100,900 CJ est. value
Paducah, KY 42001

City Hall Roof Replacement
Infrastructure
Post-Bid
Pikeville, KY 41501

Repair Roofing Buildings 1 and 1A
Results
$2,000,000 to $5,000,000 est. value
Lexington, KY 40502

Exhibit 1 Fire Station 3 Roof
Renovation - 2,613 SF
Sub-Bidding
$500,000 CJ est. value
Georgetown, KY 40324

Phoenix School of Discovery Partial Roof Replacement
Alteration
Post-Bid
Louisville, KY 40222

Last Updated 09/27/2022 04:07 AM
Project Title

Water Plant Roof Replacement

Physical Address View project details and contacts
City, State (County) Ashland, KY 41101   (Boyd County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all labor, material, equipment, supervision, etc. and perform all work and services necessary for and incidental to the proper, completion of reroofing water plant. Tear off old roofing down to concrete deck and properly dispose of. Leave vapor barrier on concrete deck where possible. Dumpsters included in price and all cleanup. Vendor must do own roof measurements to determine quantity. Install new 2 ISO insulation on existing concrete deck with insulation adhesive. Install new tapered ISO Insulation with 1/4 per foot slope over 2 ISO on roof areas requiring drainage and 1/2 per foot slope crickets to promote positive drainage. Install .060 adhered EPDM roof system and associated flashing per specifications. Properly terminate flashing at bottom of stone coping. Replacing missing gutter. Hidden gutter and scupper to be relined. Strip stone coping joints with uncured EPDM. Furnish a $1,000,000.00 property liability Insurance Certificate. Furnish a 20 Year NDL Manufacturer's Warranty and Vendor must provide 5-year warranty on workmanship. All parapet walls to receive new coping in customers choice of color. All workers covered by Kentucky Workers Compensation Insurance. The City of Ashland is Requesting Bids for the Water Plant Roof Replacement; Filter Area and Water Plant Garage Roof, Provide Materials, Labor, and Equipment to Repair / Replace Any Damaged Areas of the Roof and All Clean Up. For the Department of Utility Operations, Division of Water Treatment Plant. The City of Ashland through its City Manager reserves the right to accept all or to reject all or any part of the bid should it be deemed to be in the best interest of the City of Ashland.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents