Last Updated | 07/21/2023 03:12 PM |
Project Title | Add Lanes and Reconstruct/Bridge Replacement/Milling and Resurfacing/Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | West Palm Beach, FL 33412 (Palm Beach County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $148,287,604 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction is anticipated to commence 10-26-2023. Counties: Palm Beach Road Name: SR 710 (Beeline Hwy) and Sr 91 Limits: From W of Cr 809a to E of Sr 708 Project(s): 41925115201(*) Federal Aid No: D421077B Project(s): 41925115202 Federal Aid No: N/A Project(s): 41925115203 Federal Aid No: N/A Total Roadway Length: 3.142 Miles Contract Days: 1726 Total Bridge Length: 0.000 Miles Total Proposal Length: 3.142 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Calendar Days For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. The improvements under this contract consist of, but are not limited to, roadway reconstruction, widening, Bridge No. 931015 replacement (removal, superstructure including traffic railing, substructure including drilled shaft), bulkhead, retaining wall, sheet piling, fencing, monitor existing structures (inspection, settlement, vibration), MOT (standard, special detour, barrier, separator, crash cushion, officer), protection (sediment, turbidity, inlet), asphalt (milling, base, superpave, friction, miscellaneous), earthwork (excavation, embankment), concrete (removal, gravity wall, culvert, endwall, shoulder barrier, median barrier, sidewalk, driveways, separator, ditch pavement, opaque barrier, prestressed pole, filling/plugging), steel (reinforcing), riprap (rubble), bedding stone, guardrail (removal, general, special post, transition, end treatment), pipe rail, drainage (inlets, manholes, junction box, pipe culvert, valley gutter, curb, curb and gutter, shoulder gutter), pavement markings (detectable, raised, painted, thermoplastic, permanent tape, bike lane), signing (single-post, multi-post, panel, object marker, panel, internally-illuminated), lighting (conduit, pull/splice box, junction box, power service, pole complete, cable distribution), signalization (conduit, signal cable, fiber optic, multiconductor, pull/splice box, power service, service wire, aluminum pole, steel mast arm, vehicular signal and loop detection, pedestrian signal and detection, controller, field ethernet, wireless communication), ITS (documentation, location, conduit, fiber optic, pull/splice box, power service, service wire, service disconnect, transformer, service pole, CCTV pole and camera, microwave detection, cabinet, field ethernet, server, UPS, remote management), utilities (adjustments, fire hydrant relocation), along SR 710 (Beeline Hwy.). C For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 Add Lanes and Reconstruct/Bridge Replacement/Milling and Resurfacing/Drainage Improvements |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |