Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

Canyon Road Sidewalk - 4380 North To Foothill Drive - City Of Provo
Infrastructure
Conception
$250,000 est. value
Provo, UT

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

Engineering Building Utah Valley University
New Construction, Infrastructure
Post-Bid
$88,148,000 CJ est. value
Orem, UT 84058

Design Build a Bicycle Park in Cherrington Park and Spring Creek Canyon and a Bicycle Playground at the Clyde Recreation Center.
New Construction
Post-Bid
Springville, UT 84663

Mill Road Roundabout
Results
$700,000 to $900,000 est. value
Spanish Fork, UT

US-89; Improve Mobility/Safety In Orem City LimitsHighway Safety Improvement/Intersection Improvements
Results
$1,500,000 to $3,000,000 est. value
UT

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Active Auto / Spanish Fork
New Construction, Infrastructure - 12,350 SF
Construction
$3,300,000 CJ est. value
Spanish Fork, UT 84660

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

Holbrook Farms Park
New Construction
Pending Verification
Lehi, UT 84043

Slate Canyon Park - PR3076 - City of Provo
New Construction
Conception
$2,300,000 est. value
Provo, UT 84606

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

1100 North Street and Waterline Project
Infrastructure
Post-Bid
Pleasant Grove, UT 84062

Last Updated 04/17/2023 12:33 PM
Project Title

Construction Manager / General Contractor for Kindness Park

Physical Address View project details and contacts
City, State (County) Pleasant Grove, UT 84062   (Utah County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $19,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Pleasant Grove City Kindness Park Project consists of the development of a 38.85-acre parcel located between 400 North and 800 North and 400 West and 600 West in Pleasant Grove. Previously, the site was the location of a large diameter steel pipe manufacturing plant. The fully developed site will include a park, cemetery expansion, public works building (future) and site, storm water detention ponds (40 ac-ft) including soccer fields, berms, trails, parking, fencing, landscaping, irrigation, utilities, etc. Please see attached concept drawings. Project will include demolition of existing buildings, concrete structure, utilities, tree stumps, fencing, etc. as well as hazardous materials mitigation. Project will also include expansion, construction and or re-construction of surrounding streets including utilities, curb, gutter, and sidewalk, pavement, etc. The park facility will include a playground, splash pad, basketball court, futsal courts, skate park, pump track, nine square, pavilions, restrooms, utility building, shade structures, lighting, utilities, landscaping, irrigation, fencing, walls, parking, etc. City has contracted with outside suppliers for the supply and installation of playground equipment and some of the splash pad equipment. This project will include coordination with outside suppliers and installers. The complete scope of outside services has not been finalized at this time but will be accomplished during the design phase of the park. Question Submission Close Date 4/18/2023 3:00 PM MDT The City's Construction Budget for this project is $_19,000,000 Pleasant Grove City, hereinafter referred to as the "City", is seeking proposals from qualified proposers to provide Construction Manager / General Contractor ("CM / GC") services for the Pleasant Grove Kindness Park located at approximately 400 North 550 West, Pleasant Grove, Utah (the "project").

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents