Similar Projects
Z1dz--T1/ Project 554-22-136 Relocate Power for Patient Transport Cart Chargers (Va-22-00023703)
Term Contract
Design
$50,000 to $100,000 est. value
Aurora, CO 80045

Contracted Rooftop Solar PV Services
Term Contract
Bidding

Contracted Rooftop Solar PV Services
Term Contract
Bidding

Island Grove Led Marquees
Post-Bid
Greeley, CO

Fiberglass Streetlight Pole
Post-Bid
Fort Collins, CO

On-Call Emergency Generator/Transfer Switch Maintenance and Rental
Results
Brighton, CO 80601

IHHA037 Platte Valley YSC Solar Photovoltaic Array
Results
Less than $140,000 est. value
Greeley, CO

Adams City High School Theater/Gym AV/Lighting Upgrade
Alteration
Bidding
$100,000 est. value
Commerce City, CO 80022

Underground Primary Cable
Post-Bid
Glenwood Springs, CO

Provide and Install Low Voltage Cabling
Results
Loveland, CO 80537

SITE-Electric Bus Charging Stations
Alteration
Bidding
$250,000 est. value
Denver, CO

Electrical Services
Term Contract
Post-Bid
Pueblo, CO

Design/Build - Electrical Distribution System Replacement-Pueblo Academy of Arts
Results
Pueblo, CO 81005

Large Generator Preventative Maintenance and Repairs
Term Contract
Bidding
Denver, CO

50KVA Submersible Transformers
Post-Bid
Fort Collins, CO

Reported 06/03/2022 12:00 AM
Project Title

Water Treatment Plant Electrical Improvements

Physical Address View project details and contacts
City, State (County) Grand Junction, CO 81503   (Mesa County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the procurement and installation of the GJ Water Treatment Plant MCC equipment. GJ Water Treatment Plant MCC: The City of Grand Junction Water Services is responsible for the operation and maintenance of the Water Treatment Plant. Located on Orchard Mesa above the Gunnison River, the Water Treatment Plant was constructed in 1968. Much of the electrical system is original to that era. The City would like to replace the MCC with new equipment and reuse the existing PLC equipment to improve the safety and reliability of the system. The Contractor for this project shall procure all equipment and install this equipment as shown on the construction drawings (included in Appendix C) and in the construction specifications (included in Appendix B). Any additional wiring, conduit and electrical equipment necessary to complete the work shall be procured and installed by the Contractor

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents