Reported | 06/03/2022 12:00 AM |
Project Title | Water Treatment Plant Electrical Improvements |
Physical Address | View project details and contacts |
City, State (County) | Grand Junction, CO 81503 (Mesa County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project includes the procurement and installation of the GJ Water Treatment Plant MCC equipment. GJ Water Treatment Plant MCC: The City of Grand Junction Water Services is responsible for the operation and maintenance of the Water Treatment Plant. Located on Orchard Mesa above the Gunnison River, the Water Treatment Plant was constructed in 1968. Much of the electrical system is original to that era. The City would like to replace the MCC with new equipment and reuse the existing PLC equipment to improve the safety and reliability of the system. The Contractor for this project shall procure all equipment and install this equipment as shown on the construction drawings (included in Appendix C) and in the construction specifications (included in Appendix B). Any additional wiring, conduit and electrical equipment necessary to complete the work shall be procured and installed by the Contractor |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |