Similar Projects
US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

US 12/Naches Vic to Old Naches Highway Vic - Paving
Infrastructure
Bidding
$7,500,000 CJ est. value
Yakima, WA 98908

US 12/Naches Vic to Old Naches Highway Vic - Paving
Infrastructure
Bidding
$7,500,000 CJ est. value
Yakima, WA 98908

Dollar General #23747 / Harrah
New Construction, Infrastructure - 12,480 SF
Post-Bid
$2,000,000 CJ est. value
Harrah, WA 98933

Collins Road Improvement Project
Infrastructure
Post-Bid
Selah, Sunnyside, WA 98942

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Hot Mix Asphalt (HMA) Paving and Removal
Term Contract
Results
$100,000 to $250,000 est. value
Yakima, WA 98901

1st Level Reservoir Repair and Improvements
Infrastructure
Construction
$1,098,042 CJ est. value
Yakima, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

SR 410/1.0 miles E of Chinook Pass Summit - Culvert Lining
Infrastructure
Conception
$1,436,000 CJ est. value
Naches, WA 98937

SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Design
$735,000 CJ est. value
Toppenish, WA 98948

Last Updated 05/03/2023 02:07 PM
Project Title

US 12/Gordon Rd Bridge WB - Deck Rehabilitation

Physical Address View project details and contacts
City, State (County) Yakima, WA 98908   (Yakima County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing, maintaining and removing temporary crossovers and detour roadways, removing existing concrete overlay, scarifying concrete surfaces, bridge deck repair, furnishing, placing curing and texturing a modified concrete overlay on the three bridges, expansion joint modification on two bridges, removing existing sign bridge and corresponding illumination system, furnish and placing a new sign bridge, installing roadway delineation, placing slope protection rock, bark and wood mulch and landscaping plants, signing, traffic control and other work. Involves 84 items and 150 working days. Work class 6. Estimated value $7,500,000 - $10,000,000 Contact Scott Golbek Project Engineer scpeonorthmail@wsdot.wa.gov The bridge deck on Gordon Rd Bridge is showing signs of fatigue. Repair and resurface the existing bridge deck to maintain the structural integrity, continue safe operation of the highway and extend the life of the bridge. As of February 01, 2023, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the fourth quarter of 2022. The contract advertisement is expected in first quarter of 2023 and construction is anticipated to be operationally complete in the fourth quarter of 2023. WSDOT - US 12 / Gordon Rd Bridge WB - Deck Rehabilitation *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents