Similar Projects
Pine Street Pedestrian Mall & Parking Lot
Infrastructure
Bidding
$400,000 est. value
Little Chute, WI

Wisconsin Avenue Sidewalk
Post-Bid
Grand Chute, WI

Heesakker Park Kayak Launch
Post-Bid
Little Chute, WI 54140

Reconstruction of Parking Lot 3 at Appleton Memorial Park
Results
Appleton, WI 54911

Railroad Street and Creekview Lane Street Reconstruction
Results
Kimberly, WI 54136

Parking Lot Improvements
Post-Bid
$458,183 est. value
Appleton, WI 54914

Little Chute Heesakker Park Kayak Launch
Results
$70,000 est. value
Little Chute, WI 54140

Sidewalk, Curb, and Concrete Repair
Post-Bid
$310,000 est. value
Grand Chute, WI

2021 Pavement Construction - Hartzheim Drive
Results
Little Chute, WI 54130

Hortonville Cedar Street Reconstruction and Wildwind Paving
Infrastructure
Post-Bid
Hortonville, WI 54944

Pierce Park Pathways Improvements
Results
Appleton, WI 54914

CTH Q & CTH J (Lawe Street)
Infrastructure
Post-Bid
$90,000 est. value
Kaukauna, WI

Sidewalk
Results
Appleton, WI

Kimberly Railroad Street Concrete Multi-Model Trail
Results
Kimberly, WI 54136

CTH Z - Curb Replacement and Sidewalk Installation
Results
Kaukauna, WI

Reported 05/26/2022 12:00 AM
Project Title

Sidewalk Replacement

Physical Address View project details and contacts
City, State (County) Kaukauna, WI   (Outagamie County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Major Work Quantities: Removal and replacement of 11,000 square feet of 4" sidewalk Removal and replacement of 3,500 square feet of 6" sidewalk Furnish 300 lineal feet of full depth saw cutting oFurnish and install 20 curb ramp detectable warning fields Furnish and install 100 lineal feet of 30" curb and gutter Furnish and install 20 tons of 3.5 inch asphalt pavement Furnish and install 1,000 square feet of 4" sidewalk oFurnish and install 250 square feet of 4" sidewalk The above work will be let to the lowest responsible bidder and must be performed in accordance with the specifications and contract now on file with the City Clerk/Treasurer. No bid can be received or considered unless accompanied by a certified check equal to five (5%) percent of the bid, or a bid bond in equal amount payable to the City as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within ten (10) days from the date the lowest responsible bidders bid is accepted. In case the bidder fails to file such contract and bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. The Board reserves the right to reject any and all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents