Similar Projects
Monona Terrace Heat Exchanger Maintenance
Alteration
Bidding
Madison, WI 53703

Environmental Health and Safety Central Utility Connections - GPC
Alteration
Bidding
$1,350,000 est. value
Madison, WI 53715

Replace Boilers B415
Post-Bid
$10,000,000 to $20,000,000 est. value
Tomah, WI 54660

High Speed Rubberized Garage Doors
Term Contract
Post-Bid
Milwaukee, WI 53205

Boiler Replacement at Brewster Village
Results
Appleton, WI 54914

Air Compressor Replacement
Results
Less than $50,000 est. value
Madison, WI 53703

Environmental Health and Safety Central Utility Connections - MEP
Alteration
Bidding
$1,350,000 est. value
Madison, WI 53715

Mechanical Ventilation Installation And Electrical Repair
Renovation
Post-Bid
Waukesha, WI 53146

Domestic Water Heater Replacement
Results
Less than $190,000 est. value
Madison, WI 53703

Business Park Pond and Maintenance
Term Contract
Bidding
Stevens Point, WI

Plasma Disinfection Modifications
Post-Bid
Waukesha, WI 53146

Utility Renovations
Results
Less than $3,000,000 est. value
Madison, WI 53703

Chiller Replacement
Alteration
Bidding
Hudson, WI 54016

Waukesha County Expo Arena Mechanical Upgrades
Post-Bid
Waukesha, WI 53188

Stack Replacements
Results
Less than $375,000 est. value
Milwaukee, WI

Last Updated 02/13/2022 02:47 PM
Project Title

Boiler Replacement

Physical Address View project details and contacts
City, State (County) Green Bay, WI   (Brown County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, this this project includes (2) existing PK-1200 boilers, circa 1992, being replaced with (2) boilers, each with a minimum of 1,020 MBH output (85% efficient) at 180 degree leaving water temperature and 155 degree entering water temperature. New boilers shall be of similar physical size to fit the existing boiler footprint. Modifications to the rooms piping, venting, and electrical systems shall be made to accommodate boilers which vary in physical size/footprint or have differing vent and water connections from those on the existing boilers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents