Similar Projects
Will E. Seay Window Replacement and HVAC Upgrades 4314 Bishop Lane
Renovation
Sub-Bidding
$500,000 CJ est. value
Louisville, KY 40216

Split System and Rooftop A/C Replacement
Alteration
Post-Bid
Louisville, KY 40212

HVAC and Mechanical Services
Term Contract
Post-Bid
Louisville, KY

HSC 55C - IAQ Upgrades - Install Fan Filter Units and Ductwork Modifications
Alteration
Results
Louisville, KY

Restore AHU-10 System or S 5-7
Term Contract
Results
$500,000 to $1,000,000 est. value
Louisville, KY 40206

HVAC Water Treatment Services
Term Contract
Post-Bid
Louisville, KY

HSC 55C - IAQ Upgrades - Air Damper and Air Flow Measuring Stations
Alteration
Results
Louisville, KY

HVAC Renovation at TARC Union Station Bus Storage Facility
Alteration
Post-Bid
$300,000 est. value
Louisville, KY 40203

Bingham Gardens HVAC Upgrades
Alteration
Results
$150,750 est. value
Louisville, KY 40216

Air-Handling Unit Replacement
Alteration
Post-Bid
$200,000 est. value
Louisville, KY 40209

HVAC Services
Alteration
Results
Louisville, KY

Hood Cleaning
Alteration
Post-Bid
Louisville, KY

Western MS HVAC Phase 1
Alteration
Results
Louisville, KY 40212

Backup Cooling System for the Metrosafe Building
Alteration
Post-Bid
$200,000 est. value
Louisville, KY 40202

Central HS HVAC Phase 1
Alteration
Results
$22,500,000 to $23,500,000 est. value
Louisville, KY 40203

Last Updated 04/15/2023 03:03 AM
Project Title

Hazelwood Freezer/Cooler Replacement

Physical Address View project details and contacts
City, State (County) Louisville, KY 40215   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $299,652 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

ACCOUNT no. 729CAPSHW4300 The Hazelwood Center is an extended intermediate care facility. The purpose of the project is to replace the existing freezers and coolers in the kitchen area with new unit BONDING: All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. Estimated Length of Project: 180 (Substantial Completion) + 30 (Final Completion) PROJECT CONTACTS: 1. Consultant: Chirs Boggs, CMTA, (502) 326-3085, cboggs@cmta.com 2. Project Manager: Greg Schenck, Division of Engineering and Contract Administration, (502) 234-0519, Greg.Schenck@ky.gov 3. Agency: Lucy Richardson, Cabinet for Health and Family Services, (502) 361-2301, lucy.richardson@newvista.org 4. Purchasing Agent: Susan Ward, Division of Engineering and Contract Administration, (502) 226-0335, Susan.Ward@ky.gov No questions will be answered at the site visit. All technical questions shall be Emailed to the architect/engineer of record for this project. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Question Deadline 04/03/2023

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents