Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

Tower Terrace Road from Miller Road to I-380
Conception
$1,500,000 est. value
Cedar Rapids, IA

Pcc Patching
Infrastructure
Bidding

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Results
$1,380,000 est. value
Cedar Rapids, IA 52407

FY 2022 Pavement Patching
Results
$1,400,000 est. value
Cedar Rapids, IA

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

Ingleside Drive South West Pavement Improvements
Conception
$250,000 est. value
Cedar Rapids, IA 52404

Trail Ridge Road South East from Southern Indiandale Road to Red Fox Road
Results
$1,510,000 est. value
Cedar Rapids, IA

6th Street South West from Capital Drive to 800 South of Commerce Park Drive
Conception
$2,900,000 est. value
Cedar Rapids, IA 52404

22nd Street Northeast at B Avenue Pavement Improvements
Infrastructure
Results
Less than $120,000 est. value
Cedar Rapids, IA 52402

12th Avenue South East and 2nd Street Mini Roundabout
Conception
Cedar Rapids, IA

2021 Street Improvements
Infrastructure
Results
$178,000 est. value
Hiawatha, IA 52233

8th Avenue South West from 15th Street South West to Rockford Road
Conception
$1,900,000 est. value
Cedar Rapids, IA 52407

Business 30 Resurfacing and Improvements
Infrastructure
Results
Mount Vernon, IA

Last Updated 12/23/2021 02:06 PM
Project Title

15th Avenue SW from 4th Street to C Street Rehabilitation

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA 52404   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,930,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement patching, intersection tie-in reconstruction, installation of ADA compliant sidewalk ramps, replacement of driveway approaches and returns, partial sidewalk improvements, bicycle accommodations, diamond grinding, replacement of select storm intakes and applicable storm sewers, lead water service replacement, unserviceable hydrants and valve replacements, and sanitary sewer main/service improvements located at 15th Avenue SW

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents