Similar Projects
HMA Overlay Minor Structural
Infrastructure
Conception
$682,183 CJ est. value
Mooresville, IN 46158

Building Demolition
Demolition, Infrastructure
Design
$50,000 CJ est. value
Mooresville, IN 46158

Replace Superstructure - I 70
Demolition, New Construction, Infrastructure
Design
$2,499,005 CJ est. value
Exchange, IN 46151

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Rebid Robin Rd. & Hacker Dr. Sanitary Sewer Project
Infrastructure
Bidding
$950,000 CJ est. value
Martinsville, IN 46151

Bridge Deck Overlay
Infrastructure
Post-Bid
$1,634,806 CJ est. value
Exchange, IN 46151

Stability First Mens Recovery Housing Project
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Martinsville, IN 46151

East Service Area Water and Sewer Extensions
Infrastructure
Results
$2,852,205 CJ est. value
Martinsville, IN 46151

East Service Area Water and Sewer Extensions
Infrastructure
Results
$2,852,205 CJ est. value
Martinsville, IN 46151

Franciscan Health Mooresville Expansion - Phase 2
New Construction, Infrastructure - 50,000 SF
Pending Verification
$17,000,000 CJ est. value
Mooresville, IN 46158

Parks at Decatur
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Camby, IN 46113

2023 Sidewalk and Curb Project Phase II
Infrastructure
Bidding
$200,000 CJ est. value
Martinsville, IN 46151

Morgan County Justice Center Parking Lot
New Construction, Infrastructure - 100,000 SF
Post-Bid
$10,000,000 CJ est. value
Martinsville, IN 46151

2022 Sidewalk and Curb Project Phase I and II
Infrastructure
Results
$745,042 CJ est. value
Martinsville, IN 46151

StayAPT Suites / Guilford Township
New Construction, Infrastructure - 56,000 SF
Pending Verification
$22,000,000 CJ est. value
Madison Township, IN 46113

Last Updated 02/27/2023 02:10 AM
Project Title

E. County Road 750 S. Utility Extension

Physical Address View project details and contacts
City, State (County) Clay Township, IN 46158   (Morgan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,245,926 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work for which bids are to be received is for the trenchless installation of approximately 7,400 feet of 12-inch water main, approximately 1,950 of 4-inch water main, and approximately 10,000 feet of small diameter force main along E. County Road 750 S. in Plainfield, Indiana Bids shall be properly and completely executed on Bid Forms and in the order as identified and contained in the Contract Documents obtainable from the offices as stated above. Each bid shall be accompanied by a completely filled out Form No. 96, an acceptable Bid Security, and a subcontractors list. Any bid not accompanied by the above-required items shall be deemed to be a non-responsive bid. No Bidder may withdraw his proposal within a period of 60 days following the date set for the receiving of bids. The Owner reserves the right to retain any and all bids for said time and any and all bids shall remain in full force and effect during said time. The Owner further reserves the right to waive informalities and to award the Contract to any Bidder all to the advantage of the Town of Plainfield or to reject all bids. BID SECURITY: Each bid shall be accompanied by an acceptable certified check made payable to the Town of Plainfield or an acceptable bid bond in the amount equal to 10% of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears on the current Treasury Department Circular 570. BONDS: A Performance Bond and Payment Bond each in the amount of 100% of the Contract price will be required from the Contractor to whom the work is awarded. INDIANA REQUIREMENTS: Standard Questionnaire Form 96 (latest version), completely filled out and signed, including attachment of Contractor's Financial Statement as stipulated in Section III.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents