Similar Projects
Parta - Driver Training Pad
Infrastructure
Bidding
$487,000 est. value
Kent, OH

36th Street Northwest Storm Sewer and Road Reconstruction - Phase 2
Infrastructure
Bidding
$2,937,561 est. value
Canton, OH

Waterline/ Storm Drainage/Walking Path Project
Post-Bid
Less than $504,000 est. value
Lakeview, OH

Various Catch Basins
Post-Bid
Canton, OH 44702

Edgewood Court Storm Sewer
Results
Less than $49,400 est. value
Mason, OH

Debris Racks and Access Road Improvements in Various Locations Design/Build
Results
$285,687 est. value
Cleveland, OH 44115

Miscellaneous 2020-2021 Storm Sewer Projects
Infrastructure
Bidding
Stow, OH

Harry Sauner Storm Sewer Improvements
Post-Bid
Less than $210,000 est. value
Hillsboro, OH 45133

US 50 Concrete and Catch Basin Repair
Results
Less than $216,498 est. value
Milford, OH

Fire Station 23 Storm and Sanitary Sewer Repairs
Infrastructure
Bidding
Cleveland, OH 44102

Sewer Modernization and Replacement Tunnel (Smart) Project
Post-Bid
Dayton, OH

Enclave Retention Pond Improvements
Results
Northwood, OH

2020 Storm Sewer Project
Post-Bid
Oakwood, OH 45419

Sewer and Water Kills - Land Bank
Term Contract
Results
Toledo, OH

Water Line Leak Detection and Locating Services
Post-Bid
Dayton, OH

Last Updated 06/21/2021 03:51 PM
Project Title

Storm Sewer Repair

Physical Address View project details and contacts
City, State (County) Piqua, OH   (Miami County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace 495 LF of storm pipe. The current alignment crosses private property and goes underneath a garage. The project abandons existing pipe that has failed and installs 495 LF of new pipe in a new alignment that avoids the garage. Replace 576 LF of storm pipe. The current alignment crosses private property and goes underneath a house. The project abandons existing pipe and installs 576 LF of new pipe in a new alignment that avoids the house. The project also includes replacing 10 LF of sanitary and creating a new headwall at the outlet of the Vine Street Storm Sewer Replace 100 LF of storm pipe. At the project site, Ess Creek goes underground into the Ess Creek Storm Sewer. The first 100’ of the Ess Creek Storm Sewer, including a headwall, must be replaced. The ravine where Ess Creek flows into the existing storm sewer is filled with debris that must be removed in order to construct the new headwall.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents