Similar Projects
Drilling of Wells and Test Borings
Infrastructure
Bidding
NY

Wellhead Treatment for 1,4-Dioxane at Plant No. 3
Alteration
Bidding
Huntington Station, NY 11746

Pumps-Furnish and Deliver Submersible Non-Clog Pumps Cornell 6NHTA
Term Contract
Post-Bid
Pomona, NY 10970

Pump Seals
Post-Bid
Yonkers, NY 10701

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

City of Batavia Wellfield Well C Expansion, Contract B: Well and Site Improvements
Infrastructure
Bidding
Batavia, NY 14020

Backwash Pumps and VFD`s Replacement for the Water Treatment Plant
Post-Bid
Oneonta, NY 13820

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Boiler Room Sump Pump and Attic Catwalk
Infrastructure, Alteration
Bidding
Port Chester, NY

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

Town of Watson Water District #4 Extension #1
Results
Less than $6,000,000 est. value
Lowville, NY 13367

Water Plant Pump Replacement
Infrastructure
Bidding
Sharon Springs, NY 13459

United Wappinger Water District - Hilltop Well Connection
Post-Bid
Less than $320,000 est. value
Wappingers Falls, NY 12590

Complete Turnkey Rebuilding of an Existing Sulzer/Johnston Vertical Turbine Pump
Results
Millwood, NY 10546

Last Updated 09/27/2021 04:30 PM
Project Title

Circulating Pumps Repair and Replace, DFAS-ROME

Physical Address View project details and contacts
City, State (County) Rome, NY 13441   (Oneida County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary: - Contractor shall provide repair to leaking impellers on circulation pumps #3, #4, provide new full replacement to associated flex connectors, valves, couplings, piping and insulation. Contractor shall provide new and install full pump replacement to circulation pumps #5, #6, and #7, #8 provide new full replacement to associated flex connectors, valves, couplings, piping and insulation. Contractor shall provide and install the necessary new schedule 40 black iron piping, all new couplings & new flange packs, new flex connectors, new triple duty valves, new suction diffusers, new gauge piping, install new insulation around replaced piping, valves, shall properly balance systems and provide balance report to Government. - Contractor shall re-build impellers that are associated with existing circulation pumps #3, #4 . Shall replace seals, bearing, and strainers to impellers units. New piping, flex connectors, triple duty valves, suction diffusers, isolation flanges. Overhead piping system shall be new and installed from ‘said elbows’. Contractor shall follow Uniform Plumbing Codes & practices; provide proper support of overhead piping and fittings. Support and/or hangers shall be installed to alleviate uncontrolled movement and down pressure. - Contractor shall provide and install two (2) new circulation pumps for #5 & #6, and provide and install two (2) new circulation pumps for #7 & #8 to match existing pumps. New piping, flex connectors, triple duty valves, suction diffusers, isolation flanges. Overhead piping system shall be new and installed from ‘said elbows over to air separator unit’. Contractor shall follow Uniform Plumbing Codes & practices; provide proper support of overhead piping and fittings. Support and/or hangers shall be installed to alleviate uncontrolled movement and down pressure. - Contractor shall provide and install new piping that is associated with the two (2) expansion tank repairs, replace rusted black iron pipe with new copper pipe, as well as provide and install new vents, valves and drains.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents