Similar Projects
City of Belleville Infrastructure Improvements
Bidding
Belleville, IL

W--Washer and Dryer Lease
Post-Bid
North Chicago, IL

Fall Protection Anchorages & Suspended Scaffolding Systems Services
Term Contract
Post-Bid
Chicago, IL 60602

Sludge Cake Conveyor Replacement
Results
Gurnee, IL 60031

Ellwood House Chair Lift Replacement
Results
De Kalb, IL 60115

One New 2020 P185WDO T4F Air Compressor
Post-Bid
Wheaton, IL 60189

Remove and Replace Compressor #3 and #4 at Jackson Elementary School
Results
Chicago, IL 60607

Concrete Storage Bins
Post-Bid
Joliet, IL

Administration Building Audio/Visual Upgrades
Results
Rockford, IL 61104

DFS-Metro Bio Lab Freezer Repair-SLB
Post-Bid
Belleville, IL 62226

Portable Air Compressor
Results
Lake in the Hills, IL

Repair CO Detectors
Post-Bid
$25,000 to $100,000 est. value
Belleville, IL 62225

Water Conditioning Equipment & Salt
Term Contract
Results
Champaign, IL

OSHA/ANSI Testing and Inspection Service for Aerial Lifts and Cranes
Term Contract
Post-Bid

Watseka High School Elevator
Addition
Results
Watseka, IL 60970

Reported 02/19/2021 12:00 AM
Project Title

Hoist Purchase and Installation

Physical Address View project details and contacts
City, State (County) Rockford, IL   (Winnebago County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This will include the removal and disposal of the current four hoist system, and the supply and installation of the new four hoist system. Removal of all (piping, hydraulic tanks, air lines, motors, etc.) will be included. All terminated electrical connections will be properly capped off. The trench, which housed the underground piping and air lines, will be filled with concrete once all the piping has been removed. The concrete should be flush with the existing floor as to not pose a trip hazard. The concrete should be poured by industry standards to provide longevity. Disposal of the trench covers shall also be included.

Details

Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents