Similar Projects
Cedars Lodge and Spa
Demolition, New Construction, Infrastructure
Design
$60,091,960 CJ est. value
Hendersonville, NC 28791

Legacy Place Industrial/Manufacturing Flex Space
New Construction, Infrastructure
Design
$13,500,000 CJ est. value
Fletcher, NC 28732

Hendersonville WWTF Ultraviolet Disinfection Improvements Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Hendersonville, NC 28792

Hendersonville WWTF Ultraviolet Disinfection Improvements Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Hendersonville, NC 28792

Guion Farms Restroom Building
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Hendersonville, NC 28739

Hendersonville Fire Station No. 1 and Edwards Park
Demolition, New Construction, Infrastructure
Post-Bid
$9,500,000 CJ est. value
Hendersonville, NC 28792

Corrugated Aluminized Pipe
Infrastructure
Results
Hendersonville, NC 28791

Grading, Drainage and Paving Extension of SR 1970 (Commercial Boulevard) to SR 1803 (Crest Road) in Henderson County
Infrastructure
Results
NC

Carriage Park Entrance Culvert Rehabilitation
Construction
Hendersonville, NC 28791

Fleming Street Medical Office Building
New Construction, Infrastructure - 13,536 SF
Pending Verification
$7,800,000 CJ est. value
Hendersonville, NC 28792

Senior Apartments
New Construction, Infrastructure - 63,360 SF
Pending Verification
$10,000,000 CJ est. value
Hendersonville, NC 28739

The Stillwell
New Construction, Infrastructure - 65,000 SF
Design
$18,500,000 CJ est. value
Hendersonville, NC 28792

Four Seasons Boulevard Pollinator Bed Project
Infrastructure
Bidding
$27,000 CJ est. value
Hendersonville, NC 28792

RFQ Contractor - Wastewater Treatment Facility (WWTF) Ultraviolet Disinfection Improvements
Renovation
Post-Bid
$2,750,000 CJ est. value
Hendersonville, NC 28792

Corrugated Aluminized Pipe
Infrastructure
Results
Hendersonville, NC 28791

Last Updated 11/24/2022 05:34 AM
Project Title

North Fork Reservoir Dredging

Physical Address View project details and contacts
City, State (County) Mills River, NC 28759   (Henderson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $942,310 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hendersonville North Fork Reservoir Dredging Project generally consists of the removal of accumulated sediment in the North Fork Reservoir deposited by Big Creek and Fletcher Creek to meet and maintain water supply demands for the City of Hendersonville. An estimated volume of up to 7,500 cubic yards of accumulated sediment and debris will be dredged from the reservoir. The work will include but is not limited to dewatering of the reservoir, temporary stream diversions and equipment crossings, erosion control measures, and material/sediment removal and hauling to the disposal site, and all incidentals to complete the work. The excavated materials will be transported by the successful Contractor to the disposal site located at the City of Hendersonville Water Treatment Facility at 4139 Haywood Road, Mills River, North Carolina. The City has undergone a prequalification process and has determined five prequalified bidders eligible to bid on this project. Only these bidders listed herein will be permitted to submit bid proposals, and no bid from any entity other than those listed herein shall be considered. Bidders for this Project must be properly licensed in North Carolina at the time of bid and must at all times be in good standing and authorized to do business in the State of North Carolina. Prequalification does not ensure that a bidder will be determined a responsible bidder. The following Contractors have been prequalified for bidding by the City: Baker Grading & Landscaping, Inc. Harper General Contractors North State Environmental, Inc. Shamrock Environmental Corporation Tennoca Construction Company

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents