Similar Projects
Holm Automotive Group / Salina
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Salina, KS 67401

Tidal Wave Auto Spa Car Wash / Salina
New Construction, Infrastructure - 10,766 SF
Design
$2,500,000 CJ est. value
Salina, KS 67401

Oakdale Senior Village Oakdale and Johnstown
New Construction, Infrastructure
Design
$750,000 CJ est. value
Salina, KS 67401

Improvements - Salina Regional Airport
Demolition, New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Salina, KS 67401

Interconnect with Saline RWD #3
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Salina, KS 67401

Interconnect with Saline RWD #3
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Salina, KS 67401

2022 Pavement Sealing
Term Contract, Infrastructure
Results
KS

Milling and HMA Overlay
Infrastructure
Results

Delano Multimodal Center and Park-N-Ride - City of Wichita
New Construction, Infrastructure
Pending Verification
$19,600,000 CJ est. value
Salina, KS 67401

Delano Multimodal Center and Park-N-Ride - City of Wichita
New Construction, Infrastructure
Pending Verification
$19,600,000 CJ est. value
Salina, KS 67401

Hyatt Place Hotel / Salina
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Salina, KS 67401

Salina Parks Concrete Improvement Project #2
Infrastructure
Post-Bid
$100,000 CJ est. value
Salina, KS 67401

2022 Chip Seal
Infrastructure
Results
Salina, KS

Kenwood Park Improvements - Saline County
Renovation, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Salina, KS 67401

Bituminous Crack Sealing
Infrastructure
Results
Salina, KS

Last Updated 04/24/2023 09:07 AM
Project Title

Donmyer and Water Well Road Improvements

Physical Address View project details and contacts
City, State (County) Eureka, KS 67448   (Saline County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $894,579 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Donmyer and Water Well Road Improvements Work shall consist of removing the existing structures, constructing reinforced concrete drainage boxes, grading, aggregate surfacing, traffic control, and seeding at the locations shown on the construction plans. Any questions regarding the specifications or the bidding process are to be addressed to Saline County Administrative Resource Center at (785) 309-5810. The County reserves the right to reject any and all bids and to waive technicalities. Saline County shall make the decision as to what constitutes a technicality. No bid may be withdrawn after opening time for a period of 90 days. Late bids will be rejected. The Contractor will commence the work required by the Contract Documents no earlier than October 1, 2022 (Early Start Date). This is the date utility relocations are expected to be completed. Upon approval by Saline County, the Contractor may begin construction earlier if utility relocations are completed sooner. The project must be completed by September 29, 2023 (Completion Date). Once construction has started, the Contractor has 120 working days with 0 clean up days, beginning with the first day traffic control is in place, to complete each project. In the event the Contractor fails to complete this work on or before the dates herein established, Saline County shall be entitled to liquidated damages of $400.00 for each day the work goes uncompleted. A bid bond, cashier's check or a certified check in an amount of not less than five Percent (5%) of the total amount of the bid shall accompany each proposal made payable without conditions to "Saline County." The amount of the said proposal guarantee may be retained by and forfeited to Saline County as Liquidated Damages if the proposal covered thereby is accepted and a contract based thereon is awarded and the bidder should fail to enter into a contract in the form prescribed, with legally responsible sureties, within ten (10) days after such award is made by Saline County. Performance bond: A contract bond to Saline County, in an amount equal to 100 percent (100%) of the Contract price. Statutory Payment Bond: A payment bond to Saline County in an amount equal to 100 percent (100%) of the Contract price. The Contractor shall file the Statutory Payment Bond at the office of the Clerk of the District Court. liquidated damages of $400.00 for each day the work goes uncompleted

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents