Similar Projects
Fire Hydrants
Infrastructure
Bidding
Beverly, MA

Emergency Water Repairs
Infrastructure
Bidding
Salisbury, MA

Advanced Metering Infrastructure (AMI) Replacement
Infrastructure
Post-Bid
Ipswich, MA

Ductile Iron Pipe
Infrastructure
Post-Bid
Beverly, MA

Scheduled and Emergency Cleaning, Inspection, and Repairs of Water Quality Control Structures (WQCS) in the I-90 and I-93 Tunnels
Results
Less than $734,644 est. value

New Drainage System at Balconies, Heritage Heights MA 99-1
Results
Less than $90,000 est. value
Saugus, MA 01906

Salisbury Water System Repair of Ruptured or Leaking Water Mains, Service Lines and Fire Hydrants
Infrastructure
Bidding
$500,000 est. value
Salisbury, MA

Pond Treatment Management
Term Contract
Post-Bid
$105,000 est. value
Lynn, MA

Water and Sewer Supplies
Term Contract
Results
$340,000 est. value
Lawrence, MA

Repair Sleeves
Infrastructure
Bidding
Beverly, MA

Maintenance of Detention Basins at Various Locations
Infrastructure
Post-Bid
$90,800 est. value

Water and Sewer Supplies
Results
Lawrence, MA

School Street Water Main Improvements Project
Infrastructure
Post-Bid
$520,000 to $1,400,000 est. value
Manchester-By-The-Se, MA

Retaining Wall Replacement
Results
Less than $30,000 est. value
Salem, MA 01970

Meaders Lane Neighborhood Infrastructure Improvements Project -- Phase I
Infrastructure
Post-Bid
$1,268,000 est. value
Salisbury, MA 01952

Last Updated 06/20/2022 01:14 AM
Project Title

Water Main Replacement and Drain Installation

Physical Address View project details and contacts
City, State (County) Rockport, MA 01966   (Essex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Involves replacement of 3,000-feet of water pipe and installation of 1,500-feet drain replacement. Install 8-inch DI water pipe with (1 to 2)-inch copper services; temporary above ground water bypass; drain structures and (8 to 18)-inch HDPE/DI drain pipe; temporary and permanent trench paving

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents