Similar Projects
Z2da--Upgrade Water Distribution Legionella Prevention Project # 590-18-103 Hampton VA Medical Center
Term Contract
Design
$2,000,000 to $5,000,000 est. value
Hampton, VA 23667

Private Water Well At Halifax, Va
Renovation, Infrastructure
Bidding
Halifax, VA 24558

Purchase, Deliver and Install Touchless Plumbing Fixtures
Post-Bid
Christiansburg, VA

Plumbing Equipment - Rinnai Tankless Water Heater
Post-Bid
Capron, VA 23829

MARMC Chilled Water Piping Insulation
Results
Norfolk, VA 23511

Indoor Plumbing Rehabilitation (IPR) Program Housing Rehabilitation
Renovation
Results
$54,000 est. value
Yorktown, VA 23690

On-Demand Plumbing Services
Term Contract
Post-Bid
Suffolk, VA

Plumbing Services
Term Contract
Results

Plumbing Supplies
Term Contract
Post-Bid
Hampton, VA

Specialized Plumbing Services
Results
$200,000 to $299,999 est. value
Arlington, VA

Curbio 5518
Post-Bid
Alexandria, VA 22312

Citywide Plumbing Services
Results
Less than $50,000 est. value
Norfolk, VA

Plumbing Equipment Grab Bars - Furnish and Deliver Only
Post-Bid
State Farm, VA

21-Des-Itb-594 Plumbing Repair Services
Results
VA

Branch's Baptist Stormwater Retrofit
Post-Bid
Richmond, VA 23224

Last Updated 02/25/2022 03:59 PM
Project Title

James River Visitor Center, VA, Plumbing & Well Protection

Physical Address View project details and contacts
City, State (County) Monroe, VA 24574   (Amherst County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install James River Visitor Center Well Head Protection - Blue Ridge Parkway: 1. Removing the existing wellhead slab in the parking island. Replace the slab with a footer, a new concrete block structure, and a new stainless-steel hinged entry hatch. The structure will be hidden from view by the addition of native plants. 2. In the VC plumbing closet, the existing plumbing/piping, pressure tanks, pressure switches, meters, valves, and appurtenances will be replaced. 3. Removal and replacement of existing plumbing fixtures and valves. During this process the contractor shall replace tiles and patch the existing walls damaged during the plumbing r replacement process. 4. Removal and replacement of the exterior drinking fountain if funding is sufficient.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Water Supply Wells.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents